4
Placing the boiler
Logano GB125 BE US/CA - Technical specifications are subject to change without prior notice.
16
4
Placing the boiler
This chapter describes how to install and place the boiler
in the boiler room.
4.1
Wall clearances
Wherever possible, position the boiler with the recom-
mended wall clearances. Reducing the minimum clear-
ances makes the boiler more difficult to access.
The boiler base or foundation must be perfectly flat and
level.
The burner door is factory-fitted with the hinges on the
right. The burner door can be converted to left hand
closing.
Fig. 8
Wall clearances in the boiler room (boiler posi-
tioned on the right-hand side)
Caution:
Risk of system damage due to
freezing.
V
Install the heating system in a frost-free
room.
Dimen-
sion
Wall clearance
A
Recommended
40"
minimum
27"
B
Recommended
27"
minimum
16"
C
Recommended
28"
minimum
20"
D
Recommended
16"
minimum
6"
L
Æ
Chapter 2.6.1, page 10
Tab. 9
Recommended and minimum wall clearances
(dimensions in inches)
The boilers are designed for a side clearance
of 6 ".
Where applicable, allow extra wall clearanc-
es for additional components such as DHW
tank pipe connections, flue silencer, other
flue components, etc.
Warning:
Risk of fire from flammable materi-
als or liquids.
V
Clearances less than 6" must comply with
local and statutory codes.
V
Make sure that there is a sufficient clear-
ance between combustible materials and
the chimney connection as specified by
NFPA 31 (distance of 18 ").
V
The floor must comply with the require-
ments of NFPA 31.