5
Boiler installation
Logano GB125 BE US/CA - Technical specifications are subject to change without prior notice.
30
V
Remove the top cover of the controls.
– Unscrew the cover screws [1].
V
Secure the programming unit with self-tapping screws
[2].
Fig. 25 Cover, removing
1
Cover screws
2
Self-tapping screws
5.8.2
Fitting the temperature sensor assembly
V
Feed the capillary tubes and the sensor lead [2]
through the cable entry in the front boiler top panel [1]
to the sensor well [3].
V
Roll up surplus capillary tubes and sensor lead and lay
flat on the thermal insulation.
V
Feed the burner cable [4] through the cable entry in the
front boiler top panel [1] to the programming unit.
V
Connect the burner cable [4] to the programming unit
as indicated by the terminal markings.
Fig. 26 Routing and connecting cables
1
Cable entry in the front boiler cover
2
Capillary tube and sensor cable
3
Boiler sensor well
4
Burner cable
1
2
7 747 019 141-22.1RS
Caution:
Capillary tubes can get damaged
from severe kinking or sharp burrs.
V
Route capillary tubes carefully, avoiding
bending them excessively.