4
Tank Assembly
Logalux PL750/2 S - Changes may be made following technical improvements!
12
4.1.3
Installation of tank temperature sensor for
boiler control at MB
1
measuring point
V
Insert the solar temperature sensor [1] into the top of
the tank at location MB
1
next to the top Clean-out
Cover [3]. Push the sensor wire [2] the entire length of
the well until it meets resistance.
Fig. 9
Measuring point MB
1
1
Temperature sensor for boiler control
2
Sensor spring wire
3
Top clean-out cover
4
Flange
4.1.4
Installation of tank temperature sensors
M
1
– M
8
Absolutely make sure that the entire sensor surface is in
contact with the storage tank.
V
Cover the contact surface with a thermo-conductive
paste.
V
Snap the temperature sensor into the tension spring on
the storage tank so that the contact surface is smooth.
V
Carefully secure the sensor wire
Fig. 10 Installation of the system sensors
(basic drawing)
1
Temperature Sensor
2
Tension Spring
2
3
4
1
6 720 615 217-12.1RS
MB
1
AW/EZ
EZ/AW
6 720 615 217-14.1RS
2
1
Содержание Logalux PL750
Страница 33: ...7 Logalux PL750 2 S Changes may be made following technical improvements 33 Notes...
Страница 34: ...7 Logalux PL750 2 S Changes may be made following technical improvements 34 Notes...
Страница 35: ...7 Logalux PL750 2 S Changes may be made following technical improvements 35 Notes...