79 / 150
Manual PRO50-150 V.2
4-
START-UP AND ADJUSTMENTS
Once the BSV salt water chlorinator has been installed, you can start up your
salt water chlorination equipment. Follow the instructions carefully.
The following sections detail the operation of different models.
4.1- PRO series equipment
4.1.1- Operation
The PRO series equipment has an LCD screen, in which you can view and
configure all operations of the equipment. The following table shows how to
organize the configuration menu of the equipment:
Chlorinating Menu:
Chlorination menu
Main menu
% of production
Max ORP / CL
Configuration
Super chlorination
Chlorination
(Calibration of free chlorine probe)
pH
Relay
pH menu
Clock
Salt
pH +/- (set point value)
Probe calibration
Configuration menu
Manual pump priming
On/Off pH
Language
Control
Relay menu
Cell cleaning cycle
Volume (m3)
On/Off (START/STOP)
Outdoor/Indoor
Program 1
Cover (N)S
Program 2
Cover(Y) -> Switch N.A
OFF Program
Cover(Y) -> Switch N.C
Timer,min
Flow Switch (N)S
Acid (Alkali)
Clock menu
pH Alarm (Y)N
Night Alarm (Y)N
Clock (time setting)
Salt menu
Calibration