©2004,2002 BRUNO INDEPENDENT LIVING AIDS, INC.®
25
SRE-2700 06-11-2004
INSTALLATION
4) Once the rail position is determined, place one screw in the
back foot of each clamp assembly to hold the rail in place
while securing the foot clamp assemblies. Placing this one
screw will also help prevent the clamp foot from rotating
while tightening the screws.
5) Tighten the bolts securing the foot clamp assemblies
to the rail.
6) Install and tighten the screws in the remaining
foot clamps (back clamp first, then front clamp).
7) Check tightness of all screws/bolts.
8) Run the carriage/seat assembly up and down the rail
to recheck the seat-to-wall clearance, and to verify
correct operation of all elevator components.
1) Before securing, all clamps and with the seat in the central
riding position, use the rocker switch to run carriage/seat
assembly completely down and up the rail. Observe the
seat-to-wall clearance.
2) Repeat the run with the seat in the folded position. If
necessary, adjust the rail placement by sliding it closer
to, or further from the wall.
3) Make a total of 5 or 6 trial runs to be sure all components
are functioning correctly, and that proper seat-to-wall
clearance is maintained over the entire length of travel.
These 5-6 runs will also help clean paint chips out of the
gear rack which can be vacuumed or brushed away (see
Lubrication section).
ALWAYS PARK THE CARRIAGE AT THE
UPPER OR LOWER END OF THE RAIL TO KEEP
BATTERIES FULLY CHARGED.
TESTING THE UNIT
A clearance of 1/2" to 1" is acceptable.
Direction of travel of
the seat/carriage
corresponds to the
side of the rocker
switch depressed.
A slight delay will
occur between the
time the rocker
switch is depressed
and the initiation of
carriage
movement. This is
normal and is a
function of the
soft
start
feature of the
controller.
The unit should travel
noticeably faster going
up than down.
INSTALLATION NOTES
Содержание SRE-2700
Страница 11: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 11 SRE 2700 06 11 2004 INSTALLATION...
Страница 12: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 12 INSTALLATION...
Страница 34: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 34 ELECTRICAL...
Страница 39: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 39 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 40: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 40 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 41: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 41 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 42: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 42 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 45: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 45 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 46: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 46 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 47: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 47 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 51: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 51 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 53: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 53 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 54: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 54 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 55: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 55 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 56: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 56 EXPLODED VIEW AND BILL OF MATERIALS...