©2004,2002 BRUNO INDEPENDENT LIVING AIDS, INC.®
15
SRE-2700 06-11-2004
INSTALLATION
POSITIONING FOOT CLAMP ASSEMBLIES
1)
Place rail mounting foot clamps in the
pattern as indicated.
Be sure to leave a minimum space of 4"*,
as measured from the back edge of the
rail to the wall.
*The 4" clearance is needed if the seat is
to swivel 90 degrees. For installations
where the seat will swivel less than
90 degrees, the rail-to-wall clearance
may be reduced to between 3" and
3-1/2". Frequently check the seat-wall
clearance during installation.
Note:
If top or bottom clamp is omitted
because the landing is cement or
ceramic tile, or in the event that the
owner wishes not to drill holes in the
landing, a set of clamps should be
added on the second-to-last step and at
the top of stairway.
clamp placement order
4" as measured from
back edge of rail to wall.
•bottom landing
•first tread up from bottom
landing
•top landing
•first tread down from top
landing
•closest tread above and
below the rail joint(s)
•minimum of every third
tread over remainder
of staircase.
Содержание SRE-2700
Страница 11: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 11 SRE 2700 06 11 2004 INSTALLATION...
Страница 12: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 12 INSTALLATION...
Страница 34: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 34 ELECTRICAL...
Страница 39: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 39 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 40: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 40 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 41: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 41 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 42: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 42 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 45: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 45 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 46: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 46 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 47: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 47 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 51: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 51 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 53: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 53 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 54: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 54 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 55: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC 55 SRE 2700 06 11 2004 EXPLODED VIEW AND BILL OF MATERIALS...
Страница 56: ...2004 2002 BRUNO INDEPENDENT LIVING AIDS INC SRE 2700 06 11 2004 56 EXPLODED VIEW AND BILL OF MATERIALS...