ID: 182463115
41
Planning details
▪
The anesthetic gas filter plate is assembled in an installation frame or directly screwed to
the cage
6.2.1.4
Filter plate for magnet exhaust system
Position, alignment, and assembly
▪
On the ceiling or on the side wall beneath the ceiling of the Faraday cage.
▪
The ideal position is determined by the position of the external outlet of the exhaust vent.
The position should be selected so that the length between magnets and outlet is minimal
and can be produced with as few bends as possible (see chapter
▪
The gas filter plate is assembled in an installation frame or directly screwed to the cage.
6.2.1.5
MRI CryoProbe™ filter plate
Position, alignment, and assembly
▪
Near the floor.
▪
The ideal position is determined by the position of the cryo-coolers. The position should be
selected in such a way that the distance between the MRI CryoProbe™ preamplifier and the
cryo-refrigerator cooler is the absolute minimum possible. The minimum bending radius of
the MRI CryoProbe™ transfer lines of 70 cm must be taken into account at the planning
stage.
▪
The MRI CryoProbe™ filter plate is assembled in an installation frame.
6.2.1.6
In-vivo filter plate
Position, alignment, and assembly
▪
At a comfortable working height.
▪
The ideal position is determined by the position of the animal monitoring units in the animal
preparation area.
▪
The
in-vivo
filter plate is assembled in an installation frame or directly screwed to the cage
6.2.1.7
Filter plate for Faraday cage ventilation
Position, alignment, and assembly
For further details, please see chapter
.
The installation of the exhaust system at one of the side walls of the magnet area is advanta-
geous in terms of possible future upgrades of the magnet.
Содержание BioSpec 117 AVANCE III
Страница 1: ...Innovation with Integrity MRI T Site planning BioSpec 117 16 AVANCE III Version 1 7...
Страница 6: ...Contents 6 ID 182463115...
Страница 33: ...ID 182463115 33 Planning details Stray field Figure 6 3 Stray field...
Страница 72: ...72 ID 182463115 Planning details...
Страница 82: ...82 ID 182463115 Delivery and transport...
Страница 84: ...84 ID 182463115 Moving or dismantling the MR system...
Страница 92: ...Figures 92 ID 182463115...
Страница 94: ...Tables 94 ID 182463115...
Страница 101: ...ID 182463115 107 Lastpage...
Страница 102: ...Bruker Corporation info bruker com www bruker com...