20
ID: 182463115
Installation schedule
▪
If during temporary storage, the period between delivery and scheduled initial operation ex-
ceeds the permitted storage times of the magnets, the MR system owner must organize
maintenance of the magnet with cryogenic liquids (see
).
The temporary storage location of the cold magnet needs sufficient safety means for the
storage of liquid cryogens, i.e. a suitable ventilation system.
4.3.3
Prerequisites for operation
The following prerequisites must be fulfilled for before the system can be put into operation:
▪
A contact person who can continuously be reached must be named by the MR system own-
er
▪
Access to the installation site must generally satisfy the local safety specifications that apply
to MR systems.
▪
During the installation period, it must be guaranteed that only people authorized by the Bruk-
er BioSpin MRI employee have access to the installation site.
▪
The Bruker BioSpin MRI employee needs to obtain a key allowing access the installation
site. If necessary, he must be allowed access to adjacent rooms and/or buildings and circuit
diagrams, as well as facilities and systems in the building.
▪
All technical specifications for the different areas must be met in full
▪
All safety specifications must be met in full
▪
The rooms must be clean and ready for occupancy. They must meet the specifications of
environmental conditions/pollution level at the installation site
▪
all necessary house connections for installation are available and operational
▪
no construction work in progress at the installation site
▪
Tools and materials needed to put the system into operation are available in their entirety.
It is explicitly pointed out that non-fulfillment of the technical and/or relevant safety specifica-
tions may lead to the stop of the system being put into operation and may be regarded as a
delay in acceptance.
Содержание BioSpec 117 AVANCE III
Страница 1: ...Innovation with Integrity MRI T Site planning BioSpec 117 16 AVANCE III Version 1 7...
Страница 6: ...Contents 6 ID 182463115...
Страница 33: ...ID 182463115 33 Planning details Stray field Figure 6 3 Stray field...
Страница 72: ...72 ID 182463115 Planning details...
Страница 82: ...82 ID 182463115 Delivery and transport...
Страница 84: ...84 ID 182463115 Moving or dismantling the MR system...
Страница 92: ...Figures 92 ID 182463115...
Страница 94: ...Tables 94 ID 182463115...
Страница 101: ...ID 182463115 107 Lastpage...
Страница 102: ...Bruker Corporation info bruker com www bruker com...