ID: 182463115
85
Checklist for preparing to install the system
9
Checklist for preparing to install
the system
In order to be able to install the MR system on schedule, the following check list must be com-
pleted in full 6 weeks at the latest prior to the scheduled installation date and sent, signed, to
your Bruker BioSpin MRI branch.
9.1
Customer information
If the completed check list does not reach the local Bruker BioSpin MRI branch in time, instal-
lation by Bruker BioSpin on the scheduled date may be canceled and postponed.
Person responsible for the MR system at the customer site
NAME:
POSITION:
TELEPHONE:
FAX:
EMAIL:
DELIVERY INFORMATIONEN:
DELIVERY ADRESS:
DATE OF DELIVERY:
Содержание BioSpec 117 AVANCE III
Страница 1: ...Innovation with Integrity MRI T Site planning BioSpec 117 16 AVANCE III Version 1 7...
Страница 6: ...Contents 6 ID 182463115...
Страница 33: ...ID 182463115 33 Planning details Stray field Figure 6 3 Stray field...
Страница 72: ...72 ID 182463115 Planning details...
Страница 82: ...82 ID 182463115 Delivery and transport...
Страница 84: ...84 ID 182463115 Moving or dismantling the MR system...
Страница 92: ...Figures 92 ID 182463115...
Страница 94: ...Tables 94 ID 182463115...
Страница 101: ...ID 182463115 107 Lastpage...
Страница 102: ...Bruker Corporation info bruker com www bruker com...