SET-UP
sbl2007-001-001_a
Pull out right side handle grip and unscrew M6 x 16
throttle lever housing socket set screw. Discard
screw as there are new ones in the PDI kit.
sbl2007-001-002_a
Push out throttle lever housing just enough to gain
a little room on the inside approximately 12.7 mm
(1/2 in).
sbl2007-001-003_a
Align and slide upper handlebar cover under left
side engine stop switch housing [1] and then,
close it down slowly toward right side making sure
to align
all 5 male/female tabs
along the way.
sbl2007-001-004_a
Press upper and lower handlebar covers together
so tabs clip in position.
Secure upper and lower covers using three K40
x 16 screws (P/N 241 141 660) and washers
(P/N 234 051 600) included in the predelivery kit.
sbl2007-001-005_a
Push throttle lever housing back in position and
secure in place using an M6 x 16 (P/N 250 000 036)
socket head screw (with scotch grip — from
predelivery kit).
F02K0KA
1
2
4
5
3
Place an insert [1] (P/N 277 000 554) (from
predelivery kit) into notch in handlebar.
Slide handle grip [2] back in place making sure it
bottoms at proper place.
Predelivery
2008-1
11 / 29