![Boumatic StepMetrix Скачать руководство пользователя страница 35](http://html1.mh-extra.com/html/boumatic/stepmetrix/stepmetrix_installation-operation-maintenance-and-service-instructions_2796612035.webp)
StepMetrix™ Installation Instructions
9E-864C
35
7. Disconnect the following components from the co ntrol
assembly.
a. The power connector on power supply
board (J1)
b. Power to the l oad cell signal conditioning
board (J16)
c. Ribbon cable to the lo ad cell si gnal
conditioning board
d. CAT 5E cable
e. Communication cable to the ID control at
J6 on the control assembly
8. Replace the control assembly and reconnect the cables
disconnected in Step 7.
9. Switch on the circuit breaker to th e StepMetrix
controller power supply.
7.7
Dealer Service Schedule
Table 2: Dealer Service Schedule
Activity Interval
Inspect and replace rubber
mat, if needed
6 months or one million
passes
Check rubber mat bolts,
positioning rail bolts,
concrete bolts, controller
fastening and cable routing
6 months
Calibrate sensor module
Every 6 months or after
drastic changes in
temperature
Содержание StepMetrix
Страница 13: ...14 Wiring diagram label P N 3558769 l864_14 StepMetrix Installation Instructions 9E 864C 13 ...
Страница 14: ...9E 864C StepMetrix Installation Instructions 14 14b The control assembly l864_14b 14a Load cell board l864_14a ...
Страница 20: ...9E 864C StepMetrix Installation Instructions 20 21 Load cell locations l864_24 ...
Страница 21: ...22 ISO ID wiring wiring diagram label P N 3559299 l864_25 StepMetrix Installation Instructions 9E 864C 21 ...
Страница 22: ...9E 864C StepMetrix Installation Instructions 22 24 The control assembly l864 27 23 Load cell board l864_26 ...