A) Check that the lead wires are inside the rib.
B) Check that the lead wires are not trapped by the
cover.
C) Check the position of the lead wire setting
position
25. Replace the filter assembly, ensuring that none
of the leads are trapped (Fig. 63).
26. Replace the top cover, ensuring that none of the
leads are trapped (Fig. 64).
27. Replace the socket head bolt (Fig. 65).
28. Confirm that the tip of all 4 of the socket head bolt
is sticking out of the housing (Fig. 66).
29. Always carry out 5-10 test cycles of the tool on
waste material before using on a finished surface to
expel any cleaning material residue (Fig. 67).
ACTION
WHY
HOW
Clean magazine and feeder mechanism.
Prevent a jam.
Blow clean daily.
Keep contact arm working properly.
Promote operator safety and
Blow clean daily.
efficient Nailer operation.
Maintenance chart
Содержание GCN40T
Страница 89: ...2002 96 EC 2006 66 EC Bostitch Bostitch GNC40T GF28WW GF33PT Stanley Bostitch StanleyBostitch...
Страница 90: ...40 C StanleyBostitch Stanley Bostitch Stanley Bostitch DC 89 686 EEC EEC EN166...
Страница 91: ...50 C 120 F 0 32 F 40 C 104 F 0 C 32 F 40 C 104 F 0 40 C 0 C 40 C 20 25 C 15...
Страница 93: ...2 9B12073R E 2 60 20 C 120 BOSTITCH 1 1 20 C 3 4 2 i 6 ii 7 iii 8 iv 3 5 Ah V 1 4 Ah 7 2V 9B12072R EU 60 mins...
Страница 94: ...1 2 3 horseplay 1 2 3 4 5 50 C 120 F...
Страница 95: ...1500m 5000ft 0 C 30 F 1 1 3 2 3 3 3 2 3 4 1 4 5 OFF 2 i 6 ii 7 8 iii 9 5 1 9 2 10 3 11 10...
Страница 96: ...1 12 2 3 13 GCN40T E 15 20mm 12 20mm 6 2 3 1000 GF33PT GF28WW 10 A 10mm 30mm 20mm 15mm 35mm 20mm 20mm 40mm 20mm...
Страница 98: ...5 1 2 Bostitch 24 Bostitch Bostitch StanleyBostitch GasNailer BOSTITCH O rings EN 12549 ISO WD8662 11 11...
Страница 101: ...100mm 0 5 50 C 120 F Bostitch Bostitch Bostitch 50 C 120 F Bostitch Bostitch Bostitch...
Страница 102: ...mm mm C mm D Kg E LPA 1s d F LWA 1 s d G m s2 H I a mm b mm J K L M N O 20 c 70f P Q R Kg S T Kg U 2...
Страница 235: ......
Страница 236: ......
Страница 237: ......
Страница 238: ......