S2000-2
Maintenance
91
www.bolid.com
S2000-2
0V
+12V 3
4
XT1.2
XT4.1
LOOP
−
2
LOOP+
1
8.2 kOhm±5%
0V
RIP-12
+12V
B
A
1
2
XT1.1
D0-2
LEDG2
LEDR2
BEEP2
D1-2
7
6
5
3
4
XT3.2
A
amperemeter
D0
LEDG
LEDR
BEEP
D1
GND
+U
A
B
+U
0V
S2000
Reader
3
4
1
2
GND2
+12V2
1
2
XT4.2
LOOP
−
4
LOOP+
3
8.2 kOhm±5%
XT2.1
EXIT1
9
DOOR1
8
8.2 kOhm
±5%
GND1
10
8.2 kOhm
±5%
D0-1
LEDG1
LEDR1
BEEP1
D1-1
7
6
5
3
4
XT2.2
D0
LEDG
LEDR
BEEP
D1
GND
+U
Reader
GND1
+12V
1
2
XT3.1
EXIT2
9
DOOR2
8
8.2 kOhm
±5%
GND2
10
8.2 kOhm
±5%
Figure 18. Wiring the S2000-2 Controller for Operability Inspection.
Содержание S2000-2
Страница 1: ...Orion ISS Access Controller S2000 2 User s Manual ISO 9001 ...
Страница 5: ...S2000 2 Features and Design 5 www bolid com FEATURES AND DESIGN ...
Страница 8: ...Orion ISS www bolid com 8 ...
Страница 9: ...S2000 2 Specifications 9 www bolid com SPECIFICATIONS ...
Страница 12: ...Orion ISS www bolid com 12 ...
Страница 13: ...S2000 2 Operating 13 www bolid com OPERATING ...
Страница 47: ...S2000 2 Installation 47 www bolid com INSTALLATION ...
Страница 67: ...S2000 2 S2000 2 Programming 67 www bolid com S2000 2 PROGRAMMING ...
Страница 89: ...S2000 2 Maintenance 89 www bolid com MAINTENANCE ...
Страница 94: ...Orion ISS www bolid com 94 ...
Страница 95: ...S2000 2 95 www bolid com Appendix Connecting Some Models of Readers to the S2000 2 Controller ...
Страница 100: ...4 Pionerskaya Str Korolev 141070 Moscow Region Russia Phone fax 7 495 513 32 35 Email info bolid ru www bolid com ...