
DATE PRINTED: 2/8/05 Revision Date: 04/15/04
OM-2205 Page 14
INSTALLATION
IMPORTANT: Aeration adjustment is critical
to the correct functioning of the appliance.
Carbon
build
up,
flame
lift
or
any
malfunction due to the aeration not being
correctly adjusted during installation is NOT
covered under the warranty
Note: Aeration is factory set, but may need adjustment
FACTORY SETTING
Natural Gas
1/4” (6.35 mm) Open
LP GAS
1/4” (6.35 mm) Open
CAUTION: Parts requiring adjustment during
operation may be hot.
AERATION ADJUSTMENT
OPTIONAL THERMOSTAT
WARNING: The gas valve of this appliance
operates on a millivolt system and is not
intended to be connected to main power.
If required, a wall thermostat may be installed.
Blaze King provides a thermostat but any CSA,
ULC or UL approved 250-750 millivolt rated
non-anticipator type thermostat may be used.
It is important to use the correct gauge wire
when installing your thermostat.
Note: When installing a remote control
or wall switch use the correct gauge of
wire. See table below.
Wire Size
Max. Length
14 GA.
50 FT.
16 GA.
32 FT.
18 GA.
20 FT.
20 GA.
12 FT.
22 GA.
9 FT.
See wiring diagrams in on page 16 for
details on valve connections.
Open -Short
blue flame
Closed - Tall
yellow flame
To adjust the air shutter:
•
Loosen screw on round access panel & rotate open.
•
Use supplied adjusting rod and insert into air shutter.
•
Turn adjuster clockwise or counter clockwise as
required.
Burner Flame
Содержание 2205
Страница 9: ...DATE PRINTED 2 8 05 Revision Date 04 15 04 OM 2205 Page 9 CLEARANCES TO COMBUSTIBLES ...
Страница 16: ...DATE PRINTED 2 8 05 Revision Date 04 15 04 OM 2205 Page 16 SHROUD KIT GRILL ROD KIT INSTALLTION ...
Страница 31: ...DATE PRINTED 2 8 05 Revision Date 04 15 04 OM 2205 Page 31 NOTES ...