INSTALLATION, OPERATION AND MAINTENANCE MANUAL
Bisolid Automat OM-BAV05/02/2018/EN
7
2. GENERAL BOILER REQUIREMENTS
The boiler and all related equipment should be installed and used in accordance with the
designed installation, all applicable legal provisions and technical standards, and the
manufacturer's instructions. The boiler shall be used only for its intended purpose.
The boiler shall be installed only for the purpose it has been designed for. If the boiler is
delivered to the user and installed by the same person, the latter should provide the user with
the entire accompanying documentation of the boiler (in particular, the user`s manual). Keep
the genuine packaging of the boiler until its commissioning, in case the boiler should be
transported again.
After installation, the boiler should be commissioned by a service provider, authorized by the
manufacturer.
The boiler complies with the European Union applicable provisions. If the boiler is to be used
in countries outside the EU, all deviations from local laws and legal provisions should be
identified and corrected.
In case of defect, contact a service provider authorized by the manufacturer. Any incompetent
intervention might damage the boiler (and possibly the accompanying equipment).
During initial commissioning of the boiler, the service technician should acquaint the user with
the boiler main parts, different boiler systems and how to control the boiler. The technician
should acquaint the user with the safety equipment and elements of the boiler, their signals
and explain the appropriate reaction of the user. If the boiler is delivered to the user and
installed by the same person, the latter should ensure that genuine packaging is available in
case the boiler should be transported again.
Check the delivered boiler accessories.
Check whether the delivered model and type of the boiler correspondent to the use
requirements.
When you are not sure how to control the boiler read carefully the relevant instructions in this
operation and installation manual and proceed accordingly.
Never take off or damage the marks and signs on the boiler. Keep the genuine packaging,
until commissioning of the boiler, in case the boiler should be transported again.
Always use, only genuine parts for repairs. It is forbidden to make any changes on the internal
installation of the boiler or to change anything in anyway.
At the end of its lifetime, the boiler should be packed and together with its parts disposed of in
a manner that prevents pollution of the environment.
The manufacturer is not liable for damages caused by non-compliance with:
Terms and conditions provided for in this operation and installation manual.
Applicable regulations and standards.
Installation and operation procedures.
Warranty card terms and conditions.
The possible situations that can be possible to occur, and key precautions to be taken:
Содержание Automat 25
Страница 2: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL Bisolid Automat OM BAV05 02 2018 EN 2...
Страница 70: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL Bisolid Automat OM BAV05 02 2018 EN 70...
Страница 75: ...INSTALLATION OPERATION AND MAINTENANCE MANUAL Bisolid Automat OM BAV05 02 2018 EN 75...