KBF-LQC (E5.2) 12/2010
page 23/106
•
Installation height: max. 2000 m above sea level.
A water tap (1 bar to 10 bar) is necessary for the installation of the humidification system (chap. 4.3). If no
suitable house water connection is available, you can manually supply water by filling the freshwater can
(option, chap. 17.9).
When placing several units of the same size side by side, maintain a minimum distance of 250 mm be-
tween each unit. Wall distances: rear 100 mm, sides 160 mm. Spacing above the unit of at least 100 mm
must also be accounted for.
CAUTION
Danger by stacking.
Damage to the units.
∅
Do NOT place climatic chambers on top of each other.
To completely separate the unit from the power supply, you must disconnect the power plug. Install the
unit in a way that the power plug is easily accessible and can be easily pulled in case of danger.
With an increased amount of dust in the ambient air, clean the condenser fan (by suction or blowing)
several times a year.
Avoid any conductive dust in the ambiance according to the unit layout complying with pollution degree 2
(IEC 61010-1).
Do not install or operate the climatic chamber KBF-LQC in potentially explosive areas.
DANGER
Explosion hazard.
Danger of death.
∅
Do NOT operate the unit in potentially explosive areas.
¾
KEEP explosive dust or air-solvent mixtures AWAY from the vicinity of the unit.
Having turned off the unit, you must close the tap of the water supply. Install the unit in a way that the
freshwater supply is easily accessible.
Содержание APT.line KBF-LQC Series
Страница 102: ...KBF LQC E5 2 12 2010 page 102 106 21 7 Dimensions KBF LQC 240...
Страница 103: ...KBF LQC E5 2 12 2010 page 103 106 21 8 Dimensions KBF LQC 720...
Страница 107: ......