Installation, Operation and Maintenance Manual
MAN712 Rev. 9
June 2021
Battery Maintenance and First Installation
Section 12: Battery Maintenance and First Installation
111
13. Fasten the two screws of the Battery Pack Card.
Figure 40
14. If used, connect the 3 wires connector of the Auxiliary Battery Pack to CN3 of the
Process Card and fasten its screws.
Figure 41