
- 73 -
MAINTENANCE
MAINTENANCE
Control panel
Turn the controls panel I, as shown in figure
Fig. 9.7, to access in an optimal manner the
components inside the boiler.
Fig. 9.7
I
9.4 Reassembly the external panels
Side panels
Fit the external panels E and G in the reverse
order to that described on section "Disman-
tling the external panels" to page 72.
Front panel
• Fit the front panel D, hooking it on the up-
per side.
• Push the spring towards the internal side of
the boiler and simultaneously push the front
case panel D
until it is completely hold in
place (Fig. 9.8) step 1-2.
• Repeat the same operation on the opposite
side of the front panel D, (Fig. 9.8) step 3-4.
• Ensure that the front panel edge is close-
fitting to the side panels.
• Lock in place the panel D
with the appropri-
ate screws A
(Fig. 9.6.
Fig. 9.8
D
E
G
9.5 Emptying the c.h. system
• Close the c.h. isolating valves (3 and 5 in
Fig. 9.9).
Fig. 9.9
Close
position
3
5
Содержание Activ A 25S
Страница 79: ... 79 MAINTENANCE MAINTENANCE Fig 9 25 Winter ...
Страница 82: ... 82 NOTES ...
Страница 83: ......