- 71 -
MAINTENANCE
MAINTENANCE
9
MAINTENANCE
9.1 Warnings
The procedures detailed in this chapter
must
be carried out only by a Gas Safety Reg-
istered Engineer
. Thus you are advised to
contact an Authorised Service Agent.
For Ireland (IE), the servicing work must be
carried out by a competent Person.
For efficient and continuous operation of the
boiler you are advised to have, at least once
a year, maintenance and cleaning done by an
Approved Service Engineer.
Isolate the appliance from the electricity
supply
by turning off the fused spur isolation
switch adjacent to the appliance and turn off
the gas cock, before carrying out any proce-
dures, whatsoever, for cleaning, maintenance,
opening or dismantling boiler panels. The En-
gineer should complete the Service Interval
Record at the back of the manual.
9.2 Programming the maintenance
period
• Activate the clock function, as described in
"Time/Day/Date setting" to page 15.
• Enter “programming mode” by holding down
keys 12 - 15 - 16 together for 10 seconds
(Fig. 9.1) until the LCD display indicates the
letters
P01
, indicating entry in “parameter
01” (Fig. 9.2).
Fig. 9.1
9
10
11
12 13
14
15
16
17
Fig. 9.2
• Scroll through the various parameters using
key 15 or 16 until the LCD display indicates
the letters
P28
and the value of the param-
eter, indicating entry in “parameter 28” (Fig.
9.3).
Fig. 9.3
• Use key 9 or 10 to modify the value of pa-
rameter 28 from
00
months to
48
months.
The value
99
, which disables the mainte-
nance request, is permitted.
The writing
P28
-
SEt
alternates on the dis-
play (Fig. 9.4).
Содержание Activ A 25S
Страница 79: ... 79 MAINTENANCE MAINTENANCE Fig 9 25 Winter ...
Страница 82: ... 82 NOTES ...
Страница 83: ......