Bekamatic SC pg. 11
r eingeben]
[H ier eingeben]
[H ier eingeben]
4)
Drill the corresponding holes for the fixation
of the chemical anchors according to the
supplier’s installation instructions. Drilled
holes must be vertical.
5)
Remove any dust and small particles from the
drill holes using a brush and hand pump. This
will ensure perfect adhesion between the
resin, ground anchor and the concrete
foundation.
6)
Place the chemical anchors according to
the supplier’s instructions. Resin drying
times must be observed.
5.3.
Preparing installation levels:
1)
Screw the lower adjustment nuts onto their
ground anchors some 25mm above the
concrete and place the 3D washers onto the
nuts.
2)
Using a spirit level (see photo) adjust the
height of all 4 nuts so that they are horizontal
to one and other. The guiding post position
serves as a reference point for the installation
of the other main components (Roller
assembly, lock post and support roller).
3)
The nuts of each mounting position (rear roller
assembly and lock post) should be perfectly
horizontal and relative to another, so that the
horizontal and vertical positions for the main
support elements of the gate are correctly
aligned before the gate is lowered onto the
anchors.
Содержание Bekamatic SC 6000 Line
Страница 1: ...Bekamatic SC pg 1 Cantilever sliding gates Bekamatic SC 6000 Line Installation Manual ...
Страница 8: ...Bekamatic SC pg 8 4 1 Gates opening to the right ...
Страница 9: ...Bekamatic SC pg 9 4 2 Gates opening to the left ...
Страница 28: ... Hie Bekamatic SC pg 28 r eingeben Hier eingeben Hier eingeben This Manual is made on 13 05 2019 ...