Bekamatic SC pg. 6
•
The connection to the electrical power supply must be carried out by a
qualified technician and in accordance with the regulations and
standards that are applicable in the country of installation.
3.
Guidelines for gate lifting
•
Gates are delivered to the
construction site completely
assembled.
•
Lift-up points for
unloading and
positioning during
the installation.
•
The gate may only be lifted using the correct lifting tackle. This should
have an up to date test certificate and be sufficiently dimensioned for
the weight of the gate. By preference use undamaged flexible lift
slings with sufficient lifting capacity.
4.
Foundations
•
Foundations prepared according to the corresponding drawing.
-
For standard range of gates see page 5 and 6. For the
drawings and dimensions see page 7.
-
For all non-standard executions and gate combinations, please
consult the special foundation drawings supplied with the gate.
-
The gate must not be installed following the slope of the
construction site. Make sure that the foundation for the lock post
is at the same level as the foundation for the guiding post.
-
1 cable pipe for the connection between the power source and
the gate guiding post.
-
Install an extra cable pipe between the gate and the place of
operating (signal cables).
-
1 cable pipe for the cable connections between the guiding
post and the lock post (Photocells).
-
DO NOT LAY SIGNAL CABLES IN THE POWER SUPPLY
CABLE PIPE!
Содержание Bekamatic SC 6000 Line
Страница 1: ...Bekamatic SC pg 1 Cantilever sliding gates Bekamatic SC 6000 Line Installation Manual ...
Страница 8: ...Bekamatic SC pg 8 4 1 Gates opening to the right ...
Страница 9: ...Bekamatic SC pg 9 4 2 Gates opening to the left ...
Страница 28: ... Hie Bekamatic SC pg 28 r eingeben Hier eingeben Hier eingeben This Manual is made on 13 05 2019 ...