4. Commissioning
6) Actuate the
RESET
button.
7) After the connection to the electrical mains the
rotational direction of the motor must be
tested.
For this purpose press the
ON
switch
.
If the rotational direction is correct the com-
pacting piston will move backward.
If this is not the case, the ma-
chine must be disconnected from
the mains immediately and the
rotational direction of the motor
must be changed.
This can have two causes :
* Two of the three phases in the supply line
were switched.
This work is only to be carried
out by a qualified electrician.
or
* The implement hitch on your machine is
equipped with a phase inverter.
The phases are hereby switched by the
insulating part being rotated by 180° by
applying light pressure to a lock.
4.
03
L1
L2
L3
Содержание ALPHA-PACK-BIN
Страница 2: ......
Страница 6: ......
Страница 16: ......
Страница 20: ......
Страница 28: ......
Страница 34: ......
Страница 50: ......
Страница 52: ......
Страница 53: ...10 Dimensions 10 01 Illustration standard version deviations are possible ...
Страница 54: ......
Страница 60: ......
Страница 64: ......
Страница 66: ......
Страница 68: ......
Страница 70: ......
Страница 72: ......
Страница 74: ......
Страница 76: ......
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 84: ......
Страница 86: ......
Страница 88: ......
Страница 90: ......
Страница 92: ......
Страница 94: ......
Страница 96: ......