4. Commissioning
4.
01
Prior to lifting the machine,
ensure that the COMPACTION
BOX is disconnected from the
mains.
Pull the remote control plug prior
to lifting (optional).
For machines with a LIFT-TILT-
DEVICE or a cover hood, move
these to their transport position
first (optional).
1) Transport the PACK-BIN to a site with
solid, level ground.
You will find special hooks at the front side
and at the discharge opening of the unit.
2) Check to see if the mains voltage is the same
as the machine voltage.
You will find this information on a sticker
at the front side of the unit.
( e.g. in case of 380V, 50 Hz )
Commissioning must only be carried out by a BERGMANN
authorized dealer.
The following instructions have to be observed for the commissioning and in case of a later change in
location:
Electricity supply
O 220 - 240 V 3 ~
O 380 - 415 V 3 ~
O 480 V 3 ~
Frequency
O 50 Hz
O 60 Hz
Main fuse (by user)
3 x 25 A
Power rating
O 5,5 kW
O 7,5 kW
Protection
IP 44
Содержание ALPHA-PACK-BIN
Страница 2: ......
Страница 6: ......
Страница 16: ......
Страница 20: ......
Страница 28: ......
Страница 34: ......
Страница 50: ......
Страница 52: ......
Страница 53: ...10 Dimensions 10 01 Illustration standard version deviations are possible ...
Страница 54: ......
Страница 60: ......
Страница 64: ......
Страница 66: ......
Страница 68: ......
Страница 70: ......
Страница 72: ......
Страница 74: ......
Страница 76: ......
Страница 78: ......
Страница 80: ......
Страница 82: ......
Страница 84: ......
Страница 86: ......
Страница 88: ......
Страница 90: ......
Страница 92: ......
Страница 94: ......
Страница 96: ......