42
Accommodation
1 - Heating controls.
2 - Diesel fuel tank.
3 - Exhaust.
4 - Boiler.
5 - Icemaker.
6 - Icemaker inlet valve.
7 - Heating fuse.
8 - Water maker circuit breaker.
9 - Water maker 3-way valve + water
fi
lter.
10 - Water maker seawater inlet seacock.
11 - Water maker high pressure pump and
control panel.
1
2
3
1
8
4
A
G
HEATING
CONTROLS
WA
A
WATER MAKER
3-WAY VALVE
WA
A
WATER MAKER
CONTROL PANEL
WA
A
WATER MAKER
INLET SEACOCK
WA
A
WATER MAKER
HIGH PRESSURE PUMP
5
6
7
9
11
10
Содержание Swift Trawler
Страница 1: ...USER S HANDBOOK ...
Страница 2: ......
Страница 6: ......
Страница 8: ......
Страница 9: ...1 General specifications 1 7 Identity papers for your Swift Trawler 42 Technical specifications ...
Страница 10: ......
Страница 14: ......
Страница 15: ...1 Leaving harbour 2 Setting out Mooring Towing 13 ...
Страница 20: ......
Страница 21: ...19 Hull Construction Maintenance Careening 3 ...
Страница 22: ...20 Hull ...
Страница 24: ...22 Hull Wetted surface area approx 43 m2 WETTED SURFACE AREA ...
Страница 26: ......
Страница 27: ...25 Deck 4 Construction Maintenance Deck equipment Cockpit Flying bridge ...
Страница 36: ......
Страница 37: ...35 Accommodation 5 Accommodation details Maintenance ...
Страница 46: ......
Страница 47: ...45 Plumbing Water tanks Water system distribution Water system drainage Sanitary equipment Gas installation 6 ...
Страница 54: ......
Страница 55: ...53 7 Electricity 12 V Circuit Shore supply 110 V 220 V Circuit Appendix ...
Страница 64: ......
Страница 68: ...66 Engines FUEL FILLER POINTS FUEL FILTERS FUEL VALVE FUEL VALVE PULL KNOBS BILGE VENTILATOR ...
Страница 70: ...68 Engines WATER FILTERS ENGINE WATER ENGINE WATER INTAKE SEACOCK ...
Страница 74: ...72 Engines BOW THRUSTER 1 1 Bow thruster 2 Relays 3 Power fuse OW S BOW THRUSTER 2 RELAYS 3 ...
Страница 76: ......
Страница 77: ...75 Navigation aids Electronics 9 ...
Страница 80: ......
Страница 81: ...79 Wintering Laying up Protection 10 ...
Страница 82: ...80 Wintering ...
Страница 84: ...82 Wintering ...
Страница 86: ......
Страница 87: ...85 Launching Preparation Lifting 11 ...
Страница 88: ...86 2335 mm 5115 mm SLING POSITION PLAN OF CRADLE AND SLING POSITIONS FOR LIFTING Launching ...
Страница 90: ......
Страница 91: ...89 Safety 12 Prevention Gas installation Fire protection Drying up Safety equipment Visibility ...
Страница 92: ...90 Safety ...
Страница 94: ...92 Safety 2 1 1 Gas valves 2 Regulator in gas locker GAS SYSTEM GAS VALVES ...
Страница 100: ...98 Safety LIFERAFT POSITION Liferaft ...
Страница 102: ......
Страница 104: ......