REAR FRAME
CHAS
BATTERY BOX INSTALLATION
4
135
Battery Box Installation
Battery Wiring
Object Compartment
Right Bracket
Left Bracket
Screw
Tank Installation
Right And Left Tank Lids Installation
Silencing Device Installation
Heat Shield Lid
Anti-vibration Rubber Pad
Screw
SQ.
SYMBOLS
INTERVENTION/DESCRIPTION
Q.TY
OBSERVATIONS
15
16
17
18
19
20
21
22
1
1
1
1
4
Install the pieces in the given order.
Connect.
ATTENTION:
Connect the positive cable first then the
negative one.
See paragraph "4.119".
See paragraph "4.113".
See paragraph "4.158".
22
21
20
21
3
4
A
2
5
5
2
A
4
3
T.
R.
10 N m - 1.01 Kgf•m
NEW
NEW
LS
LS
19
19
17
18
19
16
15
Arexons SYSTEM 52A43
MEDIUM THREAD BRAKES
5
4
A
2
3
Содержание 2009 TREK1130
Страница 2: ...Workshop Manual 2009 ...
Страница 3: ......
Страница 9: ......
Страница 10: ...GEN INFO 1 ...
Страница 12: ...GEN INFO ...
Страница 26: ...SPEC 2 ...
Страница 28: ...SPEC ...
Страница 54: ...CHK ADJ 3 ...
Страница 57: ...CHK ADJ ...
Страница 157: ...CHAS 4 ...
Страница 162: ...CHAS ...
Страница 269: ...4 107 ENGINE CHAS ENGINE REMOVAL 1 2 3 4 5 6 8 10 11 9 7 12 ...
Страница 321: ...ENG 5 ...
Страница 326: ...ENG ...
Страница 360: ...HEAD DISTRIBUTION ENG HEAD REMOVAL 5 34 8 9 9 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 3 7 3 5 4 6 ...
Страница 362: ...HEAD DISTRIBUTION ENG VALVES AND VALVES SPRINGS REMOVAL 5 36 DRAIN INLET 12 8 9 10 11 13 14 5 8 1 2 3 4 6 7 1 ...
Страница 377: ...CYLINDERS ENG CYLINDERS REMOVAL 5 51 1 1 2 3 4 4 ...
Страница 397: ...ENG CLUTCH REMOVAL 5 71 5 8 9 10 11 12 13 13 14 1 2 3 7 CLUTCH 6 4 15 PM S ...
Страница 483: ...COOL 6 ...
Страница 485: ...COOL ...
Страница 509: ...ELEC 7 ...
Страница 512: ...ELEC ...
Страница 573: ...ELECTRIC LAYOUT ELECTRIC PLANT 7 61 ELEC ...
Страница 579: ......
Страница 581: ......
Страница 582: ......