REAR FRAME
CHAS
LOCK INSTALLATION
4
137
Lock Installation
Seat Opening Lever
Lock
Flexible Command
Screw
Screw
Bush
Screw
Object Compartment
Right Bracket
Left Bracket
Screw
Tank Installation
Tank Lids Installation Right And Left
Heat Shield Lid
Anti-vibration Rubber Pad
Screw
SQ.
SYMBOLS
INTERVENTION/DESCRIPTION
Q.TY
OBSERVATIONS
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
1
1
2
Install the pieces in the given order.
NOTE:
Reposition the battery box in the initial
position.
See paragraph "4.119".
See paragraph "4.113".
14
13
12
13
3
4
A
2
5
T.
R.
10 N m - 1.01 Kgf•m
NEW
NEW
LS
5
2
A
4
3
11
11
11
9
10
11
8
5
5
4
3
2
1
7
6
Arexons SYSTEM 52A43
MEDIUM THREAD BRAKES
5
4
A
2
3
LS
Содержание 2009 TREK1130
Страница 2: ...Workshop Manual 2009 ...
Страница 3: ......
Страница 9: ......
Страница 10: ...GEN INFO 1 ...
Страница 12: ...GEN INFO ...
Страница 26: ...SPEC 2 ...
Страница 28: ...SPEC ...
Страница 54: ...CHK ADJ 3 ...
Страница 57: ...CHK ADJ ...
Страница 157: ...CHAS 4 ...
Страница 162: ...CHAS ...
Страница 269: ...4 107 ENGINE CHAS ENGINE REMOVAL 1 2 3 4 5 6 8 10 11 9 7 12 ...
Страница 321: ...ENG 5 ...
Страница 326: ...ENG ...
Страница 360: ...HEAD DISTRIBUTION ENG HEAD REMOVAL 5 34 8 9 9 1 2 1 2 1 2 1 2 1 2 1 2 1 2 1 2 3 7 3 5 4 6 ...
Страница 362: ...HEAD DISTRIBUTION ENG VALVES AND VALVES SPRINGS REMOVAL 5 36 DRAIN INLET 12 8 9 10 11 13 14 5 8 1 2 3 4 6 7 1 ...
Страница 377: ...CYLINDERS ENG CYLINDERS REMOVAL 5 51 1 1 2 3 4 4 ...
Страница 397: ...ENG CLUTCH REMOVAL 5 71 5 8 9 10 11 12 13 13 14 1 2 3 7 CLUTCH 6 4 15 PM S ...
Страница 483: ...COOL 6 ...
Страница 485: ...COOL ...
Страница 509: ...ELEC 7 ...
Страница 512: ...ELEC ...
Страница 573: ...ELECTRIC LAYOUT ELECTRIC PLANT 7 61 ELEC ...
Страница 579: ......
Страница 581: ......
Страница 582: ......