4
Installation BRS20/22/30/32/40/42/50/52
Release 06 03/2020
2.2.1 Installing the device onto the DIN rail
2.2.2 Grounding the device
2.2.3 Connecting the ferrite (optional)
Installing an SFP transceiver (optional)
Connecting the terminal blocks
2.4.1 Power supply
2.4.2 Signal contact (optional)
2.4.3 Digital input (optional)
Operating the device
Connecting data cables
Filling out the inscription label
Making basic settings
First login (Password change)
Monitoring the ambient air temperature
Maintenance and service
Disassembly
Removing an SFP transceiver (optional)
Removing the device
Technical data
General data
Supply voltage
Power consumption/power output
Signal contact
Digital input
Climatic conditions during operation
Climatic conditions during storage
Casing widths for PoE device variants
Dimension drawings
7.9.1 Device variants with casing with characteristic
value C (plastic casing)
Содержание HIRSCHMANN BRS20
Страница 87: ...Installation BRS20 22 30 32 40 42 50 52 Release 06 03 2020 87 ...
Страница 88: ......