Installation BRS20/22/30/32/40/42/50/52
Release 06 03/2020
37
2
Installation
The devices have been developed for practical application in a harsh
industrial environment.
On delivery, the device is ready for operation.
Perform the following steps to install and configure the device:
Installing and grounding the device
Connecting the ferrite (optional)
Installing an SFP transceiver (optional)
Connecting the terminal blocks
Filling out the inscription label
2.1
Checking the package contents
Check whether the package includes all items named in the section
“Scope of delivery” on page 80
Check the individual parts for transport damage.
2.2
Installing and grounding the device
2.2.1
Installing the device onto the DIN rail
Prerequisite:
Verify that the minimum clearance at the ventilation slots is maintained to
meet the climatic conditions during operation:
Minimum clearance at the ventilation slots: 2 in (5 cm)
Note:
Decreasing the minimum clearance reduces the specified maximum
operating temperature.
See table 6 on page 38.
Содержание HIRSCHMANN BRS20
Страница 87: ...Installation BRS20 22 30 32 40 42 50 52 Release 06 03 2020 87 ...
Страница 88: ......