Mechanical installation
Version: 2.2
───
71
XTS
7.2.3
System test
Before beginning with the assembly of the guide rails, check the
functionality of the modules. You can determine whether you have
assembled the modules properly and fully as well as identifying de-
fects.
Power supply
1
2
► Connect the entire system 1 to the power supply without guide
rails
► First switch the 24 V on, then the 48 V
► Make sure that the LEDs 2 light up
1
The following LEDs 1 must light up:
• Link / Act
• 48 V / 16 A
• 24 V / 4 A
If the LEDs do not light up:
► Check the power supply units and fuses for voltage
► Check whether the connector card has been inserted
► Contact the Support/Applications Department
TwinCAT
Beckhoff also recommends checking the modules using the Twin-
CAT software.
► Start a TwinCAT project
► Scan the modules
► Check the modules for functionality
Содержание eXtended Transport System
Страница 1: ...XTS eXtended Trans port System Operating Instructions EN 4 20 2020 Version 2 2 ...
Страница 2: ......
Страница 30: ...Product overview 30 Version 2 2 XTS 3 6 3O shape 3 6 3 3 6 4Z shape 3 6 4 ...
Страница 39: ...Technical data Version 2 2 39 XTS AT2000 0233 Motor straight 233 mm All figures in millimeters ...
Страница 40: ...Technical data 40 Version 2 2 XTS AT2002 0249 Motor straight 249 mm with plug All figures in millimeters ...
Страница 41: ...Technical data Version 2 2 41 XTS AT2002 0250 Motor straight 250 mm with plug All figures in millimeters ...
Страница 45: ...Technical data Version 2 2 45 XTS AT2026 0250 Motor 22 5 curved with power supply All figures in millimeters ...