Commissioning
EL922x
110
Version: 1.0
7.5.3
EL9227-xxxx
7.5.3.1
PDO Assignment
In order to configure the process data, select the desired Sync Manager (SM 2 + 3 can be edited) in the
upper left-hand "Sync Manager" box. The process data assigned to this Sync Manager can then be switched
on or off in the "PDO Assignment" box underneath. Restarting the EtherCAT system, or reloading the
configuration in configuration mode (F4), causes the EtherCAT communication to restart, and the process
data is transferred from the terminal.
The following PDO assignments are possible:
SM2, PDO Assignment 0x1C12
Index
Size (byte.bit)
Name
PDO Content
Size (byte.bit)
0x1600 (default)
OCP Outputs Channel 1
2.0
Control__Reset
0.1
Control__Switch
0.1
[Offset]
-
1.6
0x1601 (default)
OCP Outputs Channel 2
2.0
Control__Reset
0.1
Control__Switch
0.1
[Offset]
-
1.6
Содержание EL922 Series
Страница 1: ...Documentation EL922x Electronic overcurrent protection terminals 1 0 2018 11 23 Version Date...
Страница 2: ......
Страница 68: ...Commissioning EL922x 68 Version 1 0 Fig 48 Incorrect driver settings for the Ethernet port...
Страница 79: ...Commissioning EL922x 79 Version 1 0 Fig 67 EtherCAT terminal in the TwinCAT tree left TwinCAT 2 right TwinCAT 3...