Operation
Operation manual
b maXX
BM4100 (NWR)
Document no.: 5.04052.09
83
8
8.3
Power on switching frequency
The device may not be switched on and off as often as you like. Between two switch-on-
sequences there should be a certain time period (at least 2 min.), in order to protect the
devices/fuses (see
From model code
BM4135-XXX-XXXXX-XX-3006-X-XXX-XXX
BM4145-XXX-XXXXX-XX-4008-X-XXX-XXX
BM4163-XXX-XXXXX-XX-6006-X-XXX-XXX
onwards there is no restriction of the switch-on frequency.
8.4
Notes for operation status „unregulated DC link voltage“
There is a new operation status „unregulated DC link voltage“ from firmware version FW
03.07 upwards.
The controller is able to block the IGBTs if a mains fault (but no mains power failure) oc-
curs. The device operates only with free-wheeling diodes. Therefore the DC link is not
regulated.
The function module DIO generates a signal as soon as the controller unit recognizes a
mains fault. In order that all power modules reduce the output power.
This status is displayed via the 7-segment display.
For further information refer to parameter manual
b maXX 4100
.
NOTE
In operation status „unregulated DC link voltage“ and if all 3 phases still available the
device can supply only max. 85 % of the nominal power. The device power supply
decreases to 35 % nominal power if a phase loss occurred.
A generating operation is in operation status „unregulated DC link voltage“ not pos-
sible.
Содержание b maXX 4100 Series
Страница 21: ...Safety Operation manual b maXX BM4100 NWR Document no 5 04052 09 21 of 142 2 Figure 2 Signs and labels BM416X ...
Страница 126: ...Baumüller accessories Operation manual b maXX BM4100 NWR Document no 5 04052 09 Baumüller Nürnberg GmbH 126 of 142 11 7 ...
Страница 138: ...Operation manual b maXX BM4100 NWR Document no 5 04052 09 Baumüller Nürnberg GmbH 138 of 142 Table of figures ...
Страница 142: ...Operation manual b maXX BM4100 NWR Document no 5 04052 09 Baumüller Nürnberg GmbH 142 of 142 Notes ...
Страница 143: ......