Preparing for mounting
Operation manual
b maXX
BM4100 (NWR)
Document no.: 5.04052.09
Baumüller Nürnberg GmbH
52
6.2
6.2
Preparing for mounting
Based on the planning documents and the drilling pattern (see
page 53), the cutout sections and the positions of the attachment drill holes can be deter-
mined.
h
Preparing drill holes and cutout sections.
NOTICE!
Property damage due to conductive contamination.
Therefore:
m
When performing installation work of any kind, it must be ensured that no foreign
material (e.g. drill shavings, copper strands, etc.) gets into the device as a result.
m
If possible, the drilling of the holes should be done before mounting the device and
the configuring of the cables should take place outside of the control cabinet. If this
is not possible, the device must be appropriately covered.
Remove this covering again prior to start!
CAUTION!
Eye injury due to flung particles.
Metal particles are flung when making the drill holes and the cutout sections.
Therefore:
Wear protective eye wear!
Содержание b maXX 4100 Series
Страница 21: ...Safety Operation manual b maXX BM4100 NWR Document no 5 04052 09 21 of 142 2 Figure 2 Signs and labels BM416X ...
Страница 126: ...Baumüller accessories Operation manual b maXX BM4100 NWR Document no 5 04052 09 Baumüller Nürnberg GmbH 126 of 142 11 7 ...
Страница 138: ...Operation manual b maXX BM4100 NWR Document no 5 04052 09 Baumüller Nürnberg GmbH 138 of 142 Table of figures ...
Страница 142: ...Operation manual b maXX BM4100 NWR Document no 5 04052 09 Baumüller Nürnberg GmbH 142 of 142 Notes ...
Страница 143: ......