background image

4.

Using the wall bracket as a template, locate and
drill the mounting holes in the wall. A minimum
of two (customer-supplied) fasteners will be
required. Attach the wall bracket to the wall
using the customer-supplied fasteners.

5.

Locate the 25-pin connector on the back top
right of the unit. Remove the protective black
cover and store it for future use if the control
panel is returned to the top cover.

6.

Locate the 10 ft. (3.1 m.) 25 pin M-F cable
included with the unit; attach the female end to
the 25 pin connector on the back top right of the
unit, and the other end to the connector on the
bottom of the control panel.

7.

Tighten the cable screws on each end to secure
the cable to the unit and control panel.

8.

The control panel may now be mounted on the
wall.

Water Connections

Feed Water Connection

1.

Locate the length of 3/8” O.D. tubing provided
with the unit with a quick disconnect insert on
one end and a 3/8” (.95 cm) O.D. X 1/4” (.64
cm) NPT tubing adapter on the other.

2.

Install the tubing adapter onto your 
incoming water line. We recommend a 
customer supplied shut off valve be 
installed in your feed water line. Do not 
connect the feed water to your NANOpure
DIamond TOC - UV.  You will connect the feed-
water during the “Initial Sanitization” procedure
explained later in this manual. Note: The car-
tridge pack and ultrafilter must be installed
before connecting water line.

3.

If a pressure switch is to be used, see the
“Installing a Float or Pressure Switch” section
for more information.

12

I

NSTALLATION

Note
The removable control panel was not
designed to be repeatedly removed
from the unit, therefore, you may
experience difficulty when attempting
to remove it. It is therefore 
recommended that the control panel
be permanently mounted in a remote
location or remain intact with the unit.

Caution
Repeated removal and replacement of
the control panel from the top cover
may eventually cause it to become
damaged.

Note
The blank protective cover on the rear
side panel display connector should
remain in place when the display is
not remotely located.

Blank
panel

Control Panel
Wall Mount
Bracket

Содержание NANOpure DIamond D11951

Страница 1: ...BARNSTEAD THERMOLYNE NANOpure DIamond TOC UV ultrapure water system Operation Manual Series 1195 and 1242 Model No Voltage D11951 100V 240V D12421 100V 240V LT1195X1 1 19 01...

Страница 2: ...he UV Timer 26 Resetting the TOC Lamp Timer 27 Using the TOC Analyzer 27 Setting Volumetric Dispensing 28 Setting Timed Dispensing 28 Performing a System Flush 29 Changing Purity Units 29 Temperature...

Страница 3: ...pure DIamond TOC UV directly over equipment that requires electri cal service Routine maintenance of this unit may involve water spillage and subsequent elec trical shock hazard if improperly located...

Страница 4: ...fully follow manufacturer s safety instructions on labels of chemical containers and material safety data sheets 7 Depressurize system prior to removing the cartridge pack 8 This unit is equipped with...

Страница 5: ...ter resistivity is continuously monitored by a resistivity cell and displayed on a digital display Actual system TOC values obtained by an inte grated TOC analyzer can be concurrently displayed with t...

Страница 6: ...ssure Range Gravity feed to 100 psig 7kg cm2 maximum Temperature Range 4 C 40 C 40 104 F TDS CaCO3 70 ppm Silica 1 ppm Silt 5 SDI Product Water Water Quality Resistivity 18 0 M cm TOC 2 0 ppb Flow Rat...

Страница 7: ...es under its sole responsibility that this product conforms with the technical requirements of the following standards EMC EN 61000 3 2 Limits for Harmonic Current Emissions EN 61000 3 3 Limits for Vo...

Страница 8: ...Iamond TOC UV on a bench Item Part No UV Lamp LMX13 Sanitization Cartridge CMX25 Wall Bracket Unit BC1190X12 Wall Bracket Remote Display BC1190X10 Accessory Parts Bag Includes Feed Water Tube 3 8 O D...

Страница 9: ...ion as well as fastener type must be considered when mounting this unit The mounting surface and fasteners selected must be capable of supporting a minimum of 150 lbs 68 kg Inadequate support and or f...

Страница 10: ...cap and then fully insert the lamp into the chamber 6 Make sure the UV lamp cable is tucked behind the chamber before closing and relatching the door Other Accessories Optional accessories for this u...

Страница 11: ...FF and disconnect it from the power supply 2 Slide the control panel upward about 1 4 64 cm to 3 8 95 cm just enough to clear con nector on top cover pull forward and remove The control panel fits tig...

Страница 12: ...g adapter on the other 2 Install the tubing adapter onto your incoming water line We recommend a customer supplied shut off valve be installed in your feed water line Do not connect the feed water to...

Страница 13: ...ted on the lower left side of the NANOpure DIamond TOC UV 2 Route the other end of the drain water tubing to an atmospherically vented drain and make a connection Ensure there are no kinks in the tubi...

Страница 14: ...r Settings sec tion of this manual A single LED located on the top of the control panel will illuminate to inform you of the system status as follows LED is not illuminated System is OFF or in Idle mo...

Страница 15: ...the User Settings section of this manual for information UP and DOWN arrows allow you to scroll between menu options items and values BACK allows you to return to the previous menu option item Please...

Страница 16: ...tra Low Organics Type 1 Water Deionized Water Feed Each cartridge pack includes one 0 2 micron absolute final filter Cartridge Pack Installation 1 Open front left side door Turn the cartridge pack so...

Страница 17: ...factory cali brated If calibration is OK the display will show Calibration passed The display will next read Meter Self Test in progress Self Test passed Next the display will read 10 0 2 M cm This i...

Страница 18: ...or water is not required The entire sanitization procedure will take approximately 3 5 hours to complete Sanitize your NANOpure DIamond as follows 1 From the Idle display press the UP or DOWN arrow un...

Страница 19: ...STOP switch to return the unit to the normal recirculation mode 17 Remove the new 0 2 micron filter and bell assembly from the bag and insert it into the dis penser arm manifold Gently turn it clockw...

Страница 20: ...read 10 0 2 M cm This is a reading of the calibration ref erence value Finally the display will show TOC initialization TOC In progress Note The TOC initialization phase may take up to 45 seconds 4 Fr...

Страница 21: ...from the normal recirculating mode when the display is showing purity 1 Place a container under the dispenser 2 Press DISPENSE Water will start dispensing immediately Display will read xx M cm xx Lit...

Страница 22: ...ow to choose Yes 5 Press ENTER 6 Press the UP or DOWN arrow until the desired value 100 75 50 or 25 is displayed 7 Press ENTER 8 Press BACK until you return to the Idle display Setting the Displayed L...

Страница 23: ...arrow to choose Yes then press ENTER 7 Press the UP or DOWN arrow until you reach the desired month Press ENTER 8 Press the UP or DOWN arrow until you reach the desired day Press ENTER 9 Press the UP...

Страница 24: ...door 5 Reconnect the power cord and turn unit ON 6 From the Idle mode when the display reads NANOpure DIamond Idle xx xx xx xx xx xx press the UP or DOWN arrow until the display reads Advanced Menu 7...

Страница 25: ...The lamp is on 10 minutes out of every four hours Press START STOP to return to the recirculating mode Selecting the Set Point The NANOpure DIamond TOC UV electronics include a user programmable set p...

Страница 26: ...ENTER 5 Display will read Reset San Timer and show on the right side of the second line when the user will start receiving Sanitize Unit reminders 6 Press the UP or DOWN arrow to select Yes 7 Press EN...

Страница 27: ...he TOC Timer was last reset 3 Press the UP or DOWN arrow to select Yes 4 Press ENTER and the timer will be reset for 1300 hours of operational time The display will now display Reset San Timer Press B...

Страница 28: ...5 L Setting Timed Dispensing 1 From the normal recirculating mode when the display is showing purity press the UP or DOWN arrow until the display reads Auto Dispense Menu 2 Press ENTER 3 Display will...

Страница 29: ...ing purity press the Up or DOWN arrow until display will reads Change Units Press ENTER 2 Press the UP or DOWN arrow to select M cm or uS cm Press ENTER 3 Press BACK to return to the normal recirculat...

Страница 30: ...unit from the electrical power 2 If using the D8964 float switch follow the installation instructions included with the float switch for installation into a tank 3 If using the D2706 low pressure swit...

Страница 31: ...to the connection point J2 To Outlet Cell on the cal ibration board PC1190X2 5 Leave the door open Otherwise the calibration module may collide into the UF plumbing 6 Reconnect the power cord and tur...

Страница 32: ...lug the unit 13 Remove the calibration module and reconnect the cell 14 Reattach the cover plate and close and latch the door 15 Reconnect the power cord The calibration procedure is complete Remote D...

Страница 33: ...sistivity conductivity and tempera ture readings will be sent to the computer once per minute If Use TOC Analyzer has been set to Yes the TOC data will also be sent 7 Run your Microsoft Windows progra...

Страница 34: ...puter 2 From the Idle display press the UP or DOWN arrow until the display reads Advanced Menu 3 Press ENTER 4 From the Printer Attached display Press the Up or DOWN arrow for NO 5 Press ENTER 6 The u...

Страница 35: ...time purity and temperature readings and the optional TOC data once every 12 minutes Connecting and Starting the Printer 1 Make sure the printer and NANOpure DIamond are turned OFF 2 Connect the NANOp...

Страница 36: ...ll illuminate when the printer is ON Paper Feed Button Press this button once to advance the tape one line or hold the button down to advance paper continuously When the paper roll nears the end the r...

Страница 37: ...D The paper will feed automatically 5 Tear off a strip of paper and close the cover The red PAPER OUT light will be OFF if paper roll installation is successful COMPUTER PRINTER SETUP Note A colored s...

Страница 38: ...pressurization section 2 Turn unit OFF Open right side door and remove top PC board cover 3 Disconnect cable from J2 and snip plastic cable tie located on the inside top of unit 4 Unscrew and remove t...

Страница 39: ...tem 10 Replace luer cap on injection port Close door 11 Press the UP or DOWN arrow to select YES and then press ENTER Display will now read Reconnected Water NO 12 Attach feed water supply removed in...

Страница 40: ...turn the unit to the normal recirculating mode System Depressurization This should be done prior to removing a cartridge pack or an ultrafilter The unit needs to be plugged in and operat ing to correc...

Страница 41: ...s is used to effect a com plete sanitization 1 Remove the feed water line by depressing the stainless steel thumb pad 2 Depressurize the system according to System Depressurization under the Maintenan...

Страница 42: ...filter whenever any of the fol lowing conditions occur every 30 days the product water flow rate is reduced or bacteria break through To replace the 0 2 micron filter assembly 1 Remove the old 0 2 mi...

Страница 43: ...by sliding it off the UV chamber Disconnect and remove old UV lamp and dispose of it in the proper manner see Note 4 Remove the UV lamp from its packaging DO NOT TOUCH THE GLASS PORTION OF THE LAMP I...

Страница 44: ...he right side 4 Locate the clips on both sides of lamp chamber While gently pulling out chamber wedge a flat head screwdriver between chamber and clips to release chamber 5 When installing the new lam...

Страница 45: ...ame type and rating See Replacement Parts 4 Replace fuse drawer 5 Reattach the power cord 6 Operate normally Shutdown If the NANOpure DIamond TOC UV is to be shut down for an extended period of time t...

Страница 46: ...er if attached Feed water not connected Reconnect feed water Failed solenoid Replace BK1190X2 Pump protector in reservoir feed Connect the pump protector jumper water line pressure switch or jumper pl...

Страница 47: ...iodically reads properly Check UV Bulb UV lamp burned out Replace the UV lamp as described in UV Lamp Replacement Air in system Dispense more water through the NANOpure DIamond to purge air from the u...

Страница 48: ...tom of unit manifold unit manifold Remove any objects with a lint free cloth Upon system startup the PC board communication Turn the DIamond OFF I O Switch and message TOC Comm Error restart the unit...

Страница 49: ...your Barnstead Thermolyne representative for additional information on the expendables kit Recommended Description Catalog No Quantity DIamond Kit Organic Free R O Distilled Feed D50280 1 DIamond Kit...

Страница 50: ...State Ballast UV SC1191X1 1 Quartz Sleeve UV Lamp TU733X1 1 Power Supply PC Board TNX116 1 Calibration PC Board PC1190X2 1 Resistivity Meter PC Board PC896X2 1 Check Valve PMX214 1 Wire Harness UV Bu...

Страница 51: ...t line Arrow Legend Keypress Options Automatic Entry Menu Wrap around power switch turned on Depressurize Optional Printer Remote Gun Use TOC Analyzer Date Format Set Date Set Time Set Cell Constant S...

Страница 52: ...Wiring Diagram 52...

Страница 53: ...yne dealer from whom you purchased this unit or can be obtained promptly from the factory When service or replacement parts are needed we ask that you check first with your dealer If the dealer cannot...

Страница 54: ...ervice repre sentative ii misuse including use inconsistent with written operating instructions for the product mishan dling contamination overheating modification or alteration of the product by any...

Страница 55: ...55 TITLE RIGHT...

Страница 56: ...Barnstead Thermolyne 2555 Kerper Boulevard P O Box 797 Dubuque IA 52004 0797 Phone 319 556 2241 800 553 0039 Fax 319 589 0516 E mail Address mkt barnstead com...

Отзывы: