13
temperatures. If the charging sources or discharging loads exceed this
value continuously, two or more SmartShunts in parallel must used to
handle the increased current. There are two steps to this process:
1. Physically connect the SmartShunts in PARALLEL. This means that
each “BATT-” post on the SmartShunts must be connected together
with an appropriate load carrying device. In addition, each “CABLE”
post must also be connected together in a similar fashion. The easiest
way accomplish this is to use high-amperage carrying bus bars, with
correctly sized cables for each.
2. Connect the two SmartShunts on the SmartLink Network via the
Communications Cable.
3. Virtually connect the two SmartShunts together on the SmartLink
Network so that they are considered one “Master” SmartShunt by the
system. This is accomplished with the SG200 Smartphone App.
NOTE:
DO NOT connect the shunts in series, one after the other.
This will not increase the current carrying capabilities of the
system, and will most likely lead to measurement inaccuracies
and possible damage and/or fire if the current greatly exceeds
the maximum current specification for one SmartShunt.