Installation steps
NOTE:
The purpose of this manual is to enable the installer to
install SG200 in a manner that permits it to operate as designed.
This manual is not intended to educate the installer on the
regulatory requirements of any particular type of installation.
The manufacturer, supplier, dealer and/or their agents cannot
know what the final installation will be and therefore cannot know
what the regulatory requirements of such installation may be.
1. Determine a mounting location and mount the SmartShunt. The surface
should be flat. Do not install the SmartShunt on a curved surface. Note
that the cable connection bolts are not insulated on the underside of the
SmartShunt and therefore cannot be mounted into a conductive surface.
2. Remove all loads and charging sources from the battery before any other
steps are taken. This often is accomplished by turning off a battery switch.
If there are loads or chargers directly attached to the battery, they should
be disconnected as well.
3. Connect the negative cables to both sides of the studs, as shown below.
NOTE:
In a simple installation, the battery Negative (-) cable is removed
from the battery, and connected to the “CABLE” end of the shunt. Then
a new, short cable is installed from the “BATT” (-) stud to the battery.
4. Re-install the lock washers and nuts on the shunt, the battery cable lug
goes first, then the washer, and then the nut.
NOTE:
DO NOT PLACE ANYTHING between the battery lug and the face
of the shunt. Do not use nylock nuts in place of the lock-nut and washer.
5. Connect the 60” Power lead to the battery P terminal. DO NOT
EXTEND the wire from the fuse to the fuse holder, this must be kept short
for safety reasons.
Содержание SG200
Страница 1: ...SG200 BATTERY MONITOR Installation Operation Manual SUP 0250 REV A...
Страница 34: ...34 NOTES...
Страница 35: ...35 NOTES...
Страница 36: ......