3
Safety Precautions
1. Take time to read the manual. Equipment damage and possible injuries
may result from an incomplete understanding of the installation and
operation of the SG200 Battery Monitor. If you are unfamiliar with marine
electrical systems, consult with a qualified marine electrician.
2. Always disconnect your battery banks and ensure that switches are “OFF”
prior to installing the SmartShunt. No current should be flowing when the
SmartShunt is installed!
3. Remove all metal jewelry while working on your electrical system, to avoid
any completing a circuit with these items, especially bracelets, rings or
handing necklaces..
4. Wear ANSI-approved safety eye-wear and protective gear.
5. DO NOT attempt to modify the SmartShunt or Display. Modifications could
result in damage to your charging system and will void your warranty.
6. DO NOT attempt installation while using alcohol or medication that could
impair your judgment or reaction time.
7. Always use the right tool for the job. Improper tool use may damage the
shunt, gauge or your vessel, and could result in personal injury.
8. If installing in an engine compartment with a gasoline engine, proper
ventilation practices must be used to ensure no explosive gases exist
before installation.
9. If installing a compartment with batteries, the compartment must be
properly ventilated to ensure no build-up of explosive gases prior to
installation.
Содержание SG200
Страница 1: ...SG200 BATTERY MONITOR Installation Operation Manual SUP 0250 REV A...
Страница 34: ...34 NOTES...
Страница 35: ...35 NOTES...
Страница 36: ......