background image

 

 

THANK YOU & WARRANTY 

Thank you for your purchase of a machine from Baileigh Industrial Holdings LLC. We hope that 
you find it productive and useful to you for a long time to come. 

 

Inspection  &  Acceptance.

 

Buyer  shall  inspect  all  Goods  within  ten  (10)  days  after  receipt  thereof.  Buyer’s 

payment shall constitute final acceptance of the Goods and shall act as a waiver of the Buyer’s rights to inspect or 
reject  the  goods  unless  otherwise  agreed.  If  Buyer  rejects  any  merchandise,  Buyer  must  first  obtain  a  Returned 

Goods Authorization (“RGA”) number before returning any goods to Seller. Goods returned without an RGA will be 
refused.  Seller  will  not  be  responsible  for  any  freight  costs,  damages  to  goods,  or  any  other  costs  or  liabilities 
pertaining to goods returned without a RGA. Seller shall have the right to substitute a conforming tender. Buyer will 
be  responsible  for  all  freight  costs  to  and  from  Buyer  and  repackaging  costs,  if  any,  if  Buyer  refuses  to  accept 
shipment.  If  Goods  are  returned  in  unsalable  condition,  Buyer  shall  be  responsible  for  full  value  of  the  Goods. 
Buyer may not return any special-order Goods. Any Goods returned hereunder shall be subject to a restocking fee 
equal to 30% of the invoice price. 
 

Specifications.

 Seller may, at its option, make changes in the designs, specifications or components of the Goods 

to improve the safety of such Go

ods, or if in Seller’s judgment, such changes will be beneficial to their operation or 

use. Buyer may not make any changes in the specifications for the Goods unless Seller approves of such changes 
in writing, in which event Seller may impose additional charges to implement such changes. 
 

Limited  Warranty.

  Seller  warrants  to  the  original  end-user  that  the  Goods  manufactured  or  provided  by  Seller 

under this Agreement shall be free of defects in material or workmanship for a  period  of twelve (12) months from 
the  date  of  purchase,  provided  that  the  Goods  are  installed,  used,  and  maintained  in  accordance  with  any 
instruction  manual  or  technical  guidelines  provided  by  the  Seller  or  supplied  with  the  Goods,  if  applicable.  The 
original end-user must give written notice to Seller of any suspected defect in the Goods prior to the expiration of 
the  warranty  period.  The  original  end-user  must  also  obtain  a  RGA  from  Seller  prior  to  returning  any  Goods  to 
Seller for warranty service under this paragraph. Seller will not accept any responsibility for Goods returned without 
a RGA. The original end-user shall be responsible for all costs and expenses associated with returning the Goods 
to Seller for warranty service. In the event of a defect, Seller, at its sole option, shall repair or replace the defective 
Goods  or  refund  to  the  original  end-user  the  purchase  price  for  such  defective  Goods.  Goods  are  not  eligible  for 
replacement  or  return  after  a  period  of  1

0  days  from  date  of  receipt.  The  foregoing  warranty  is  Seller’s  sole 

obligation, and the original end-

user’s exclusive remedy, with regard to any defective Goods. This limited warranty 

does not apply to: (a) die sets, tooling, and saw blades; (b) periodic or routine maintenance and setup, (c) repair or 
replacement of the Goods due to normal wear and tear, (d) defects or damage to the Goods resulting from misuse, 
abuse,  neglect,  or  accidents,  (f)  defects  or  damage  to  the  Goods  resulting  from  improper  or  unauthorized 
alterations,  modifications,  or  changes;  and  (f)  any  Goods  that  has  not  been  installed  and/or  maintained  in 
accordance with the instruction manual or technical guidelines provided by Seller. 
 

EXCLUSION OF OTHER  WARRANTIES.

 THE FOREGOING LIMITED WARRANTY IS IN  LIEU OF ALL  OTHER 

WARRANTIES,  EXPRESS  OR  IMPLIED.  ANY  AND  ALL  OTHER  EXPRESS,  STATUTORY  OR  IMPLIED 
WARRANTIES,  INCLUDING  BUT  NOT  LIMITED  TO,  ANY  WARRANTY  OF  MERCHANTABILITY  OR  FITNESS 
FOR  ANY  PARTICULAR  PURPOSE  ARE  EXPRESSLY  DISCLAIMED.  NO  WARRANTY  IS  MADE  WHICH 
EXTENDS BEYOND THAT WHICH IS EXPRESSLY CONTAINED HEREIN. 
 

Limitation  of  Liability.

  IN  NO  EVENT  SHALL  SELLER  BE  LIABLE  TO  BUYER  OR  ANY  OTHER  PARTY  FOR 

ANY  INCIDENTIAL,  CONSEQUENTIAL  OR  SPECIAL  DAMAGES  (INCLUDING,  WITHOUT  LIMITATION,  LOST 
PROFITS OR DOWN TIME) ARISING FROM OR IN MANNER CONNECTED WITH THE GOODS, ANY BREACH 
BY  SELLER  OR  ITS  AGENTS  OF  THIS  AGREEMENT,  OR  ANY  OTHER  CAUSE  WHATSOEVER,  WHETHER 

BASED ON CONTRACT, TORT OR ANY OTHER THEORY OF LIABILITY. BUYER’S REMEDY WITH RESPECT 
TO  ANY  CLAIM  ARISING  UNDER  THIS  AGREEMENT  IS  STRICTLY  LIMITED  TO  NO  MORE  THAN  THE 
AMOUNT PAID BY THE BUYER FOR THE GOODS. 
 
 
 

Содержание BSVT-18P

Страница 1: ...LDINGS LLC IS PROHIBITED Baileigh Industrial Holdings LLC Inc does not assume and hereby disclaims any liability for any damage or loss caused by an omission or error in this Operator s Manual resulti...

Страница 2: ...LECTRICAL 21 MACHINE SETUP AND ADJUSTMENTS 23 Blade Changing 23 Blade Tracking Adjustment 24 Saw Bow Tilt Adjustment 25 Vise plate positioning 25 Feeding Stroke 27 Blade Speed Adjustment 28 Feed Force...

Страница 3: ...ON AND MAINTENANCE 45 Lubrication 46 Hydraulic Oil System 46 Oil Disposal 46 Accessing and Cleaning the Coolant System 46 Oils for Lubricating Coolant 46 Pneumatic Care 46 Bow Tilt Tension Adjustment...

Страница 4: ...n notice to Seller of any suspected defect in the Goods prior to the expiration of the warranty period The original end user must also obtain a RGA from Seller prior to returning any Goods to Seller f...

Страница 5: ...emedies provided under this Agreement or at law or equity Attorney s Fees In the event legal action is necessary to recover monies due from Buyer or to enforce any provision of this Agreement Buyer sh...

Страница 6: ...Description of the functional parts of the machine Capacity charts Setup and start up instructions Machine operation Scheduled maintenance Parts lists GENERAL NOTES After receiving your equipment remo...

Страница 7: ...zardous situation which if not avoided will result in death or serious injury WARNING Indicates a hazardous situation which if not avoided could result in death or serious injury CAUTION Indicates a h...

Страница 8: ...s or earplugs to protect against objectionable or uncomfortable loud noises HYDRAULIC HOSE FAILURE Exercise CAUTION around hydraulic hoses in case of a hose or fitting failure BEWARE OF PINCH POINTS K...

Страница 9: ...HIGH VOLTAGE USE CAUTION IN HIGH VOLTAGE AREAS DO NOT assume the power to be off FOLLOW PROPER LOCKOUT PROCEDURES EMERGENCY STOP BUTTON In the event of incorrect operation or dangerous conditions the...

Страница 10: ...making any modifications or alterations to a Baileigh machine Modifications or alterations to a machine may pose a substantial risk of injury to the operator or others and may do substantial damage to...

Страница 11: ...may affect proper machine operation 15 Observe work area conditions DO NOT use machines or power tools in damp or wet locations Do not expose to rain Keep work area well lighted DO NOT use electricall...

Страница 12: ...Blade Feed Operation Pneumatic over Hydraulic Blade Feed Air Supply 0 5 1 0CFM 80 100psi 55 69MPa Pneumatic Feed Force 0 150lbs 0 68kgs Vise High x Open max 6 152mm x 18 457mm Table Height 39 5 1003mm...

Страница 13: ...des For specific application needs or future machine purchases contact the Sales Department at sales baileigh com Phone 920 684 4990 or Fax 920 684 3944 Note The photos and illustrations used in this...

Страница 14: ...age painted surfaces Follow manufacturer s label instructions when using any type of cleaning product After cleaning wipe unpainted metal surfaces with a light coating of quality oil or grease for pro...

Страница 15: ...t there are no cables or pipes in the area of the forks Move the machine to the required position and lower gently to the floor Level the machine so that all the supporting feet are taking the weight...

Страница 16: ...s If long lengths of material are to be fed into the machine make sure that they will not extend into any aisles LEVELING The machine should be sited on a level concrete floor Provisions for securing...

Страница 17: ...e pump After installation of the machine and before machine startup bring the oil level up to 90 of capacity Refer to any labels or marking affixed to the outside of the machine If none exist use SAE...

Страница 18: ...15 15 OVERALL DIMENSIONS...

Страница 19: ...16 16...

Страница 20: ...hex head bolts Manual Feed Handwheel 1 Remove the tape securing the key to the shaft and install the handwheel onto the shaft over the key 2 Secure the handwheel to the shaft by tightening the set sc...

Страница 21: ...rom 0 5 1 0CFM 80 100psi 55 69MPa supply air to the air filter through the 1 4 NPT inlet port 2 Drain any accumulate moisture within the filter at least monthly Coolant Filling 1 Fill the saw base wit...

Страница 22: ...19 19 GETTING TO KNOW YOUR MACHINE A B C D F E I H G J K L M O P Q R S N...

Страница 23: ...stop coolant flow H Light Switch Turn work light on and off I Start Button Press to start band saw blade J Stop Button Press to stop band saw blade K Power Indicator Light Illuminates whenever main m...

Страница 24: ...n low voltage will damage the motor In the event of a malfunction or breakdown grounding provides a path of least resistance for electric current to reduce the risk of electric shock This machine is e...

Страница 25: ...iately Power cord connection 1 Turn the main disconnect switch on the control panel to the OFF position 2 Unwrap the power cord and route the cord away from the machine toward the power supply a Route...

Страница 26: ...E 2 Carefully remove the blade through the large opening in the saw table 3 Using compressed air blow out metal chips and grit from between the bearings blade guides and inside of the blade guards an...

Страница 27: ...to see if the back edge of the blade has maintained an approximate 1 32 gap from the flange on the back of blade wheels If the blade rides against the flange or is more than 1 32 away from the flange...

Страница 28: ...s can be mounted to the saw table 1 Place the rear vise plate 15 in a position on the table so the hold down bolts 14 are aligned with two of the eight threaded mounting holes in the tabletop 2 Use a...

Страница 29: ...wheel may be attached to either vise plate It is recommended that the angled edge of the plate be used when performing miter cuts and the vertical edge used when making vertical cuts in order to clam...

Страница 30: ...de exits a cut To adjust 1 Manually feed the saw bow forward to a position in which the teeth of the saw blade are at least 1 4 6 3mm past the farthest thickness of the material to be cut 2 Hold the s...

Страница 31: ...bronze Medium carbon steel 180 210 5 to 12 50 100 Low carbon steel 245 275 Aluminum Copper Brass 255 285 Over 12 80 and over 3 Push the start button on the control panel Twist the blade speed control...

Страница 32: ...ce part and the upper pulley housing to protect the operator from the exposed blade Second it positions the upper blade guides close to the piece part for support of the blade To properly position the...

Страница 33: ...de has been properly tensioned 3 Loosen the lock nut A while holding the adjuster B 4 Turn the adjuster to set the bearing to just barely touch the blade 0 003 This clearance can be measured with a pi...

Страница 34: ...the cut off piece can move sideways after it is cut off Otherwise it could get wedged against the blade and thrown violently Never turn the saw ON before clearing everything except the work piece ben...

Страница 35: ...s approximately 300cm of the material should be cut for breaking in If large work piece dimensions are to be cut we recommend a breaking in period of about 15 minutes After breaking in you may slowly...

Страница 36: ...easured from gullet to gullet G GAUGE The thickness of the blade H TOOTH SET The distance a tooth is bent from the blade I KERF The width of material that is removed by the blade when cutting Width of...

Страница 37: ...for transversal or inclined cutting of solid small and average cross sections or pipes in laminated mild steel and gray iron or general metal POSITIVE RAKE TOOTH 9 10 positive rake and constant pitch...

Страница 38: ...l use for materials with dimensions superior to 5 mm Used for the cutting of steel castings and hard nonferrous materials WAVY SET Set in smooth waves This set is associated with very fine teeth and i...

Страница 39: ...G A SAW BLADE A general purpose blade is furnished with this band saw To achieve a quality economical and efficient saw cut the following points must be taken into consideration Type of material being...

Страница 40: ...37 37...

Страница 41: ...ides Forcing a large width blade to cut a small radius Using a blade with an improperly finished weld joint Allowing the blade to run when not in use NEVER leave an unattended blade running MATERIAL S...

Страница 42: ...turn off the machines when the work is completed Disconnect power before adjusting servicing or changing blade Inspect damaged parts Before further use of bandsaw guards or other parts that are damag...

Страница 43: ...is aligned with the blade Replace blade brush if worn Inspect the blade replace if worn or if missing teeth Check that the proper blade is installed Check the blade tension adjust if needed Visually...

Страница 44: ...essure chart 14 Press the STOP button to stop the bow movement if needed a The saw bow will advance until the forward stop limit switch is engaged Then the saw blade will stop the frame will retract t...

Страница 45: ...ve metal chips to buildup in the pan The chips may be carried back into the saw causing premature wearing of the blade blade guides and blade wheels Clean the cutting fluid tray as often as needed Cla...

Страница 46: ...it is science There are so many variables that it is virtually impossible to cover even most of the possible combinations of factors However in general you want to cut according to the cutting rage i...

Страница 47: ...de manufacturer you need not make any adjustments for subsequent cuts from that same material If you are cutting too slowly according to that recommendation gradually increase the feed rate over the n...

Страница 48: ...ricant to all non painted surfaces Thoroughly clean the machine to remove shavings especially from the coolant tank Removal of pump from its housing cleaning of the suction filter and suction zone Cle...

Страница 49: ...per manner following your local regulations Accessing and Cleaning the Coolant System Clean the drain screens on the machine base and the drains on the ends of the table Drain and wash out the dirt an...

Страница 50: ...the M12 x 90L bolt will lessen the tension of the springs This will allow the bow to tilt more easily but may be harder to hold in position 3 Tightening the M12 x 90L bolt will increase the tension of...

Страница 51: ...48 48 ELECTRICAL DIAGRAM...

Страница 52: ...49 49 PNUEMATIC HYDRAULIC DIAGRAM...

Страница 53: ...50 50 NOTES...

Страница 54: ...51 51 NOTES...

Страница 55: ...52 52 NOTES...

Страница 56: ...TOWOC WI 54220 PHONE 920 684 4990 FAX 920 684 3944 www baileigh com BAILEIGH INDUSTRIAL HOLDINGS LTD UNIT D SWIFT POINT SWIFT VALLEY INDUSTRIAL ESTATE RUGBY WEST MIDLANDS CV21 1QH UNITED KINGDOM PHONE...

Отзывы: