Azbil Corporation
Instrument installation
Model MCB10A 2-5
•
No straight pipe section is basically needed on the downstream side. However,
ensure 2D or over if influences of drift are thought possible.
•
Choose a place where there are little pulsations in the flow (install at a place
sufficiently distant from a pump or the like).
•
Ensure the necessary space for inspecting the terminal box.
400 mm
400 mm
Figure 2-3 Necessary space for inspection
Содержание MCB10A
Страница 1: ...Electromagnetic Flowmeter for Water Measurement Model MCB10A User s Manual CM2 MCB100 2001 3rd edition...
Страница 42: ...Instrument installation Azbil Corporation 2 20 Model MCB10A...
Страница 104: ...Operation using the data setting device Azbil Corporation 5 56 Model MCB10A...
Страница 112: ......
Страница 114: ......