Chapter 3:
Installing the Hardware
Autoscope IntelliSight User Guide
©2022 Image Sensing Systems Inc.
3-2
Processor, Power Supply, and PoE Installation
The IntelliSight Processor, power supply, and PoE switch should be installed
together. They can be installed on the same din rail as shown below or in
different parts of the cabinet if more convenient.
1. Start by mounting all devices on the din rails or by placing them close to the
final location.
2. Connect the DC power connections from the power supply to the IntelliSight
Processor and the PoE switch. The power supply will have V1 and V2
connections.
Connect the red wire to V+ and the black wire to V1- on the power supply.
Then connect the red wire to the + on the Processors power connection and
the black wire to the - on the Processors power connector. Connect the red
wire to V2+ on the power supply to the V1+ on the PoE switch. Then connect
the black wire to the V2- on the power supply and the V1- on the PoE switch.
3. Connect the Cam port on the Processor to port 5 on the PoE switch.
Do not connect the Ethernet cables that will be going to the cameras yet.
4. Connect the ground screw on the front of the processor to earth ground.