Page - 11
5.3.c Set Purifier Off
The Set Purifier Off feature will allow the Digital Nano/Nano+ to be programmed to delay
chlorine production if salt will not be added to the pool water for a specified amount of time, from
1-28 days. Or if there is a need to halt chlorine production for a set amount of time.
SECTION 6 - MAINTENANCE
6.1 Fuse Location and Ratings
WARNING - Failure to heed the following may result in permanent injury or death.
l
ELECTRICAL SHOCK HAZARD – Turn off the electrical power to unit before servicing.
To inspect or service fuse, disconnect power and remove power center cover (see below for
location of fuse).
Ratings
BOARD
FUSE SPECIFICATION
DESCRIPTION
Main Power Board When Converted to 115V
75041A, 75043A, 75041A-xx, 75043A-xx
250 Vac 2 Amp Slo Blo
AC Power Fuse for 115 Vac
Operation
Main Power Board (Factory set as 230 Vac)
75041A, 75043A, 75041A-xx, 75043A-xx
250 Vac 1 Amp Slo Blo
Main AC Power Fuse for 230
Vac Operation
Location of Fuse
110V - 120V Configuration
Figure 3
220V - 240V Configuration
Figure 4
Содержание Pool Pilot Digital Nano
Страница 2: ......
Страница 6: ......
Страница 38: ...Page 32 Figure 20 Figure 21 Figure 22 Figure 23 Figure 24...
Страница 55: ......