8.2 Planning the Installation
Before installing your Pool Pilot
®
:
1. Determine everything needed for installation is on hand.
2. Determine where the Manifold Assembly will be plumbed.
3. Identify a suitable mounting location for the Pool Pilot
®
close enough, less than 12’ (3.6 m), to ensure
that the cell cord and Tri-sensor cord will reach the manifold components. Plan the routing for the cell
and Tri-sensor cables.
4. For the optional retractable pool cover installations with the Digital Nano / Nano+ models (the 863A
Expansion Board must be purchased and installed):
a. Procure / Install dry contact cover position switch or retractable cover controller as needed.
b. Plan cable (not provided) run from cover position switch to Digital Nano / Nano+.
5. Determine whether the input voltage for the Pool Pilot
®
will be 110-120 Vac or 220-240 Vac.
6. Plan wire runs and wiring connections for source power.
7. Determine origination point for the Pool Pilot
®
control unit power feed:
a. Directly from a circuit breaker. (Circuit breaker is used to power the Pool Pilot
®
and circulation
pump.)
b. From an external timer or an electronic controller. (Pool Pilot
®
is to be wired to the same
location as the circulation pump; the Pool Pilot
®
is activated when the circulation pump is
energized.)
8.3 Check Parts
Before attempting the installation, verify the following items have been included with the Digital
Nano / Nano+:
QUANTITY
DESCRIPTION
1
220 Vac - 5 foot (1.5 m) cord for 220V (pre-installed)
1
Strain relief – ½” (220V only) (models 75041A and 75043A) (pre-installed)
1
Split gland – ½” (when equipped with 863A Exp. Board. Comes with optional kit #STK0156)
1
Cell cable
4
Plastic anchors
4
Mounting screws
2
Metric PVC adapters (2” spigot x 63 mm socket) (metric manifold models only)
Table 6
Not Included
Power service electrical or bonding wire
Pool cover controller, dry contact pool cover position switch, or associated cable
Table 7
8.4 Installation Steps
Details on each step of the installation process are presented on the following pages:
1. Mounting the Digital Nano / Nano+ (See "Mounting the Chlorinator" on page 29.)
2. Electrical Connections (See "Electrical Connections" on page 29.)
l
Electrical Connections Overview
l
AC Input Voltage
l
Low Voltage Wiring
o
Connecting the Cell Cable
o
Connecting the Tri-sensor
o
Installing the Optional 863A Expansion Board
o
Connecting the Retractable Cover Switch (option available with installation of the #863A
Expansion Board)
o
Bonding
Содержание Pool Pilot Digital Nano
Страница 2: ......
Страница 6: ......
Страница 38: ...Page 32 Figure 20 Figure 21 Figure 22 Figure 23 Figure 24...
Страница 55: ......