background image

8

LKS 

- S2 24V DC

s

afety

 i

nstruCtions

n

ote

Ambient conditions

The product may not be subjected to impacts or falls, or 
to vibrations, moisture, aggressive vapors or other harmful 
environments, unless the manufacturer released it for one 
or more of these environmental conditions.
• 

Operation:

 

  Ambient temperature:   -5 °C … +60°C
  Relative humidity:     < 90% less 20°C;
        < 

50% 

less 

40°C;

        no 

formation 

of 

condensation

      Observe temperature range during
      installation!

• 

Transport / Storage:

  Storage temperature:   -5°C … +40°C
  Relative humidity:     < 60%

Accident prevention regulations and workmen’s
compensation insurance guidelines

For work on or in a building or building part the provisi-
ons and instructions of the respective accident prevention
regulations (local workmen’s compensation insurance
guidelines) shall be observed and adhered to.

Declaration of Conformity and of Incorporation

The drive is manufactured and inspected in accordance with 
European guidelines. The respective Declaration of Con-
formity and of Incorporation is on hand.

In case that the use of the drive differs from the in-
tended use, a risk evaluation for the power operated 
window shall be performed and a Declaration of Con-
formity according Machinery Directive 2006 / 42 / EG 
issued.

Commissioning, operation and maintenance

After the installation and after each modifi cation in the set 
up all functions shall be checked with a trial run. It shall 
be ensured that drive and casement are set correctly and 
that security systems, if available, are functioning properly.

After the installation of the system is completed the
end-user shall be instructed in all important opera-
ting steps. 

If necessary, he must be advised of all remaining

risks / dangers. 
The end-user shall be specifi cally instructed that no
additional forces, except pushing and pulling forces in the 
opening and closing direction of the casement, may be
applied to the spindle, chain or lever of the drive. 

n

ote

Post warning signs!

Other persons must be kept away from 
the casement when a hold-to-run switch  
(pushbutton) is operated or when a 
window, which has been opened by a 
smoke and heat exhaust system, is clo-
sing! 
The operating element of hold-to-run
switches must be installed within di-
rect view from the window, but apart 
from moving elements. If the switch is 
not a key-operated switch it must be
installed at a minimum height of 1,5 m 
and inaccessible to the public!
Do not allow children to play with
permanently mounted control devices 
and keep remote controls out of reach 
for children!

!

C

aution

!

C

aution

!

C

aution

During cleaning, maintenance work and while 
exchanging parts the drive must be comple-
tely disconnected from the power supply and 
secured against unintentional reactivation. 

During the proper assembly of drives with mounting
elements at a window, and the connection to an external 
control unit, the interfaces resulting from mechanical and
electrical performance characteristics of single elements 
shall be observed.

Replacement parts, fasteners and controls

The drive shall only be operated with control devices from 
the same manufacturer. There is no liability, warranty or 
customer service if third-party parts are used. Exclusively 
original spare parts of the manufacturer shall be used for 
mounting elements or expansions.

!

w

aRning

Do not actuate the drive or the case-
ment when repair or re-setting works are
performed!

01

Содержание LKS S2 24V DC

Страница 1: ...according to Machinery Directive 2006 42 EC annex VI LKS S2 24V DC Rack and Pinion Drives for windows Assembly and Commissioning Instructions...

Страница 2: ...a Assembly drive with frame bracket K29 Installation step 4b Assembly drive with adjustable clamping B7 and frame bracket K82 Installation step 4c Assembly drive with adjustable clamping B7 and frame...

Страница 3: ...ng Caution Warning Danger due to electric current Caution Warning Risk of crushing and entrapment during device operati on is provided as a sticker with the drive Attention Warning Risk of damage to d...

Страница 4: ...s NSHEV natural smoke and heat exhaust ventilator s in accordance with EN12101 2 without dual purpose for ventilation The need for a risk assessment at the installation site due to the reasonably fore...

Страница 5: ...witch strips or Motor current monitoring systems internal and external Hold to run switch stops movement at HSK 20 mm at a closing force of 150 N at HSK 20 ZAA 5 Operating element in direct range of v...

Страница 6: ...e electrical supply data see product lable and performance limits see technical data as well as the mounting and installation instructions of the drive must be strictly observed and adhered to Do not...

Страница 7: ...able cable lengths and cross sections shall be selected in accordance with the manufacturer s technical data If necessary the cable types shall be coordinated with the competent local authorities and...

Страница 8: ...e instructed in all important opera ting steps If necessary he must be advised of all remaining risks dangers The end user shall be specifically instructed that no additional forces except pushing and...

Страница 9: ...e and heat exhausting systems SHEV as single drive Internal load dependend cut off switch S2 Options Drillings for front suspension Monitored motion run of 2 drives up to s 300 mm via USKM Order data...

Страница 10: ...formation on the most import ant caracteristics such as manufacturer s address article reference number and name technical caracteristics date of manufacturing with firmware version serial number cert...

Страница 11: ...2200 2400 2600 Abstand Antrieb Band ffnungswinkel 2 1 3 4 5 6 7 8 9 10 1 Hubl nge 100 mm 2 Hubl nge 200 mm 3 Hubl nge 300 mm 4 Hubl nge 400 mm 5 Hubl nge 500 mm 6 Hubl nge 600 mm 7 Hubl nge 700 mm 8...

Страница 12: ...balance The test procedure of drives may only be performed on a non slip and secured mat or a test fixture During the test run the test element must not be interfered with The test my only be conducte...

Страница 13: ...2 FAB 1 2 FAB 1 4 FAB 1 4 FAB Tools required Marker Grains Hammer Screwdriver slotted head cross or Torx size by site conditions Hexagonal wrench size 4 5 Fork wrench for SW13 SW14 Torque wrench Power...

Страница 14: ...et K82 for swivelling suspension Frame bracket K5 for swivelling suspension Adjustable clamping B7 Mounting with K5 or K82 Frame bracket K21K For moving the mounting level from the horizontal to the v...

Страница 15: ...g casement outwards opening Frame assembly HSK View on aluminium window View on PVC window Roof window outwards opening Frame assembly HSK Roof window outwards opening Frame assembly HSK View on alumi...

Страница 16: ...associated bolt 6 of the casement brackets F1 into the eyebolt of LKS Optionally adjust the pressure ball of the casement bracket F1 with grub screw and the spring Adjust casement pressure using of th...

Страница 17: ...linder head screws M6 of the adjustable clamping B7 Slide the adjustable clamping B7 gently on the drive body LKS by hand do not force Screw the cylinder head screws M6 of the adjustable clamping B7 a...

Страница 18: ...e bracket K21K M6 Make sure they are parallel to casement edge Casement bracket center and rack must be in line Determine fastenings for casement bracket F10 6 frame bracket K21K and for frame bracket...

Страница 19: ...arefully clear away drilling swarfs to prevent seals from being damaged Avoid surface scratches for example by using masking tape Secure fasteners against loosening e g by applying removable thread lo...

Страница 20: ...propriate cross section for mounting dimensions see drill holes Installation stepe 3 or project specific documents and drawings Note Screws for mounting on the window are to be provided by the custome...

Страница 21: ...s s 300 mm max 2 5 A IP 54 0 C 70 C 110 x 110 x 66 mm Motion monitoring up to 3 drives 2 sequential controls DIP switches for settings Connection terminals 2 5 mm 24V Installation step 6 Electric conn...

Страница 22: ...he homepage of Firm aUM lleR aUMatIc GmbH www aumueller gmbh de Safety CheCk anD teSt Run Formula to calculate the required wire cross section of a supply line Calculation example Available data cut o...

Страница 23: ...ear or damages of cables and fastening elements must be performed During maintenance contaminations must be removed from the drive Fastenings and clamping screws must be checked for tightness Test run...

Страница 24: ...or delivered material is twelve months Warranty and liability claims for personal injuries or material damages are excluded if caused by one or more of the following No proper incoming goods inspectio...

Страница 25: ...25 LKS S2 24V DC Notes 08...

Страница 26: ...26 LKS S2 24V DC Notes 08...

Страница 27: ...s and Conditions of aUM lleR aUtoMatIc GmbH apply to all offers supplies and services The publication of these assembly and commissioning instructions supersedes all previous editions CeRtifiCate anD...

Страница 28: ...9000028501_V0 1_KW05 20...

Отзывы: