background image

2

LKS 

- S2 24V DC

08

07

06

05

04

03

02

01

 

 

  Abbreviations

 

 

  Target 

Groups

   

 

 

Warning and Safety Symbols

 

 

  Intended 

Use

 

 

  Safety 

Instructions

 

 

  Data 

sheet 

LKS

 S2

   

 

 

Areas of application and Casement sizes

   

 

 

Explanations on the product label

   

 

 

Opening angle at direct operation  

I

nstallatIon

 

step

 1:

  

Inspection before the installation

I

nstallatIon

 

step

 2:

  

Installation prerequisite and Installation preparation

I

nstallatIon

 

step

 3:

  

Frame brackets and Casement brackets and Accessories 

 

 

  Application 

examples

I

nstallatIon

 

step

 4

a

:

  

Assembly drive with frame bracket K29

I

nstallatIon

 

step

 4

b

:

  

Assembly drive with adjustable clamping B7 and frame bracket K82

I

nstallatIon

 

step

 4

c

:

  

Assembly drive with adjustable clamping B7 and frame bracket K5

I

nstallatIon

 

step

 4

d

:

  

Assembly drive with frame bracket K29 and frame bracket K21K

I

nstallatIon

 

step

 5:

  

Possibility of adjustment for the casement pressure

I

nstallatIon

 

step

 6:  

Electric connection

I

nstallatIon

 

step

 7:

  

Supply lines of the Control Unit to the drives

I

nstallatIon

 

step

 8:

 

Safety check and Test run 

   

 

 

Troubleshooting, Service and Repair

   

 

 

Maintenance and Modification

   

 

 

Removal and Disposal

 

 

  Liability

   

 

 

Warranty and After-Sales Service

3 - 8

9

10 - 11

12 - 13

14 - 15

16 - 21

21 - 22

23 - 24

C

ontents

Содержание LKS S2 24V DC

Страница 1: ...according to Machinery Directive 2006 42 EC annex VI LKS S2 24V DC Rack and Pinion Drives for windows Assembly and Commissioning Instructions...

Страница 2: ...a Assembly drive with frame bracket K29 Installation step 4b Assembly drive with adjustable clamping B7 and frame bracket K82 Installation step 4c Assembly drive with adjustable clamping B7 and frame...

Страница 3: ...ng Caution Warning Danger due to electric current Caution Warning Risk of crushing and entrapment during device operati on is provided as a sticker with the drive Attention Warning Risk of damage to d...

Страница 4: ...s NSHEV natural smoke and heat exhaust ventilator s in accordance with EN12101 2 without dual purpose for ventilation The need for a risk assessment at the installation site due to the reasonably fore...

Страница 5: ...witch strips or Motor current monitoring systems internal and external Hold to run switch stops movement at HSK 20 mm at a closing force of 150 N at HSK 20 ZAA 5 Operating element in direct range of v...

Страница 6: ...e electrical supply data see product lable and performance limits see technical data as well as the mounting and installation instructions of the drive must be strictly observed and adhered to Do not...

Страница 7: ...able cable lengths and cross sections shall be selected in accordance with the manufacturer s technical data If necessary the cable types shall be coordinated with the competent local authorities and...

Страница 8: ...e instructed in all important opera ting steps If necessary he must be advised of all remaining risks dangers The end user shall be specifically instructed that no additional forces except pushing and...

Страница 9: ...e and heat exhausting systems SHEV as single drive Internal load dependend cut off switch S2 Options Drillings for front suspension Monitored motion run of 2 drives up to s 300 mm via USKM Order data...

Страница 10: ...formation on the most import ant caracteristics such as manufacturer s address article reference number and name technical caracteristics date of manufacturing with firmware version serial number cert...

Страница 11: ...2200 2400 2600 Abstand Antrieb Band ffnungswinkel 2 1 3 4 5 6 7 8 9 10 1 Hubl nge 100 mm 2 Hubl nge 200 mm 3 Hubl nge 300 mm 4 Hubl nge 400 mm 5 Hubl nge 500 mm 6 Hubl nge 600 mm 7 Hubl nge 700 mm 8...

Страница 12: ...balance The test procedure of drives may only be performed on a non slip and secured mat or a test fixture During the test run the test element must not be interfered with The test my only be conducte...

Страница 13: ...2 FAB 1 2 FAB 1 4 FAB 1 4 FAB Tools required Marker Grains Hammer Screwdriver slotted head cross or Torx size by site conditions Hexagonal wrench size 4 5 Fork wrench for SW13 SW14 Torque wrench Power...

Страница 14: ...et K82 for swivelling suspension Frame bracket K5 for swivelling suspension Adjustable clamping B7 Mounting with K5 or K82 Frame bracket K21K For moving the mounting level from the horizontal to the v...

Страница 15: ...g casement outwards opening Frame assembly HSK View on aluminium window View on PVC window Roof window outwards opening Frame assembly HSK Roof window outwards opening Frame assembly HSK View on alumi...

Страница 16: ...associated bolt 6 of the casement brackets F1 into the eyebolt of LKS Optionally adjust the pressure ball of the casement bracket F1 with grub screw and the spring Adjust casement pressure using of th...

Страница 17: ...linder head screws M6 of the adjustable clamping B7 Slide the adjustable clamping B7 gently on the drive body LKS by hand do not force Screw the cylinder head screws M6 of the adjustable clamping B7 a...

Страница 18: ...e bracket K21K M6 Make sure they are parallel to casement edge Casement bracket center and rack must be in line Determine fastenings for casement bracket F10 6 frame bracket K21K and for frame bracket...

Страница 19: ...arefully clear away drilling swarfs to prevent seals from being damaged Avoid surface scratches for example by using masking tape Secure fasteners against loosening e g by applying removable thread lo...

Страница 20: ...propriate cross section for mounting dimensions see drill holes Installation stepe 3 or project specific documents and drawings Note Screws for mounting on the window are to be provided by the custome...

Страница 21: ...s s 300 mm max 2 5 A IP 54 0 C 70 C 110 x 110 x 66 mm Motion monitoring up to 3 drives 2 sequential controls DIP switches for settings Connection terminals 2 5 mm 24V Installation step 6 Electric conn...

Страница 22: ...he homepage of Firm aUM lleR aUMatIc GmbH www aumueller gmbh de Safety CheCk anD teSt Run Formula to calculate the required wire cross section of a supply line Calculation example Available data cut o...

Страница 23: ...ear or damages of cables and fastening elements must be performed During maintenance contaminations must be removed from the drive Fastenings and clamping screws must be checked for tightness Test run...

Страница 24: ...or delivered material is twelve months Warranty and liability claims for personal injuries or material damages are excluded if caused by one or more of the following No proper incoming goods inspectio...

Страница 25: ...25 LKS S2 24V DC Notes 08...

Страница 26: ...26 LKS S2 24V DC Notes 08...

Страница 27: ...s and Conditions of aUM lleR aUtoMatIc GmbH apply to all offers supplies and services The publication of these assembly and commissioning instructions supersedes all previous editions CeRtifiCate anD...

Страница 28: ...9000028501_V0 1_KW05 20...

Отзывы: