background image

23

LKS 

- S2 24V DC

Problem

Possible causes

Possible solutions

Drive does not 
start

•  Duration of mains

power supply too short

•  Drive run direction not

correct

•  Connecting cable not

connected

•  Power supply / Control

Unit voltage incorrect, 
too high or too low (see 
data sheet)

•  No mains supply to

power supply unit /
Control Unit 
(no voltage)

•  Drive has shut down

on overload 

•  Adjust supply voltage

as specifi ed in the 
technical documen-
tation

•  Check drive cables

•  Check all connection

cables

•  Check power supply unit

and replace if necessary

•  Connect power supply

•  First move drive in 

CLOSE position

Drive doesn‘t 
start after 
having been 
in operation 
several times

•  Operating time has been 

exceeded, drive has 
been overheated

•  See possible solutions

above associated with 
„Drive doesn‘t start“

•  Wait until drive has

cooled down and start 
again

•  See possible solutions

associated with: 
“Drive doesn‘t start“

Drive doesn‘t 
close

•  Closing edge safety

mechanism has been 
triggered (if existing)

•  See possible solutions

above associated with 
„Drive doesn‘t start“

•  Release safety area for

operation and reset 
closing edge safety 
mechanism

•  See possible solutions

associated with: 
“Drive doesn‘t start”

Drive travels 
uncontrolled in 
open and close 
direction

•  Residual ripple of power
     supply / control unit too   
      hight

•  Fault in power supply 

unit / control unit

•  Adjust drive voltage to

the required value of 
drive. (values see data 
sheet of drive)

•  Check output voltage of

power supply unit or 
control unit

h

elP

 

in

 

CaSe

 

of

 m

alfunCtionS

, R

ePaiRS

 

anD

 

m

aintenanCe

Professional repair of a defect drive can only be performed at the
manufacturer’s factory or manufacturer-certifi ed specialist company.
Unauthorized opening or manipulation of the drive terminates warranty.

1.   Exchange defect drives or have them repaired by the manufacturer.
2.   In case of problems during installation or normal operation the
 

following table might be useful:

m

aintenanCe

 

anD

 m

oDifiCation

To ensure continuous function and safety of the drive periodic maintenan-
ce by a specialist company is required at least once a year (as mandated 
by law and recommended by manufacturer). Operational readiness must 
be checked regularly. Frequent inspection of the system for imbalance 
and signs of wear or damages of cables and fastening elements must be 
performed. 
During maintenance contaminations must be removed from the drive. 
Fastenings and clamping screws must be checked for tightness. Test runs 
during the opening and closing procedure of the devices must be per-
formed.
The drive itself is maintenance-free. Defect devices may only be repaired 
in our factory. Only spare parts of the manufacturer may be used. When 
the connection cable of this device is damaged it must be replaced by the 
manufacturer or his customer service or a similarly qualifi ed person to 
avoid endangerment. 
It is recommended to conclude a maintenance contract. A sample main-
tenance contract can be downloaded from the homepage of

Firm 

a

UMÜlleR

 

a

UMatIc

 GmbH

 

(

www.aumueller-gmbh.de

). 

While cleaning the windows, drives may not have direct contact with 
water or cleaning agents. Drives must be protected from dirt and dust 
during the construction phase or renovations.

Maintenance process

1.

  Open or extend power-operated casement completely.

2.

  Completely disconnect the system from the mains and secure it 

 

against automatic or manual activation.

3.

  Check windows and fi ttings for damages.

4.

  Check all mechanical fastenings (if required, observe information on

 

torques in installation instructions). 

5.

  Check electric drives for damages and contaminations.

6.

  Check connecting cables (drive cable) for:

 

- tightness of the cable screw

 

- functionality of the strain relief

 

- damages

7.

  Check the mobility of hinges and fi ttings and re-adjust or apply

 

lubricant, e.g. silicone spray (observe the instructions of the manu-

 

facturer of this window system).

8.

  Check peripheral seal, remove contaminations or replace. 

9.

  Perform cleaning to maintain functionality (e.g. clean extending

 

elements of the drive, such as chains or spindles by damp wiping them 

 

with acid or lye-free agents and drying them and, if required, lubricate 

 

them with cleansing oil e.g., Ballistol).

10.

 Turn on operating voltage.

11.

 Open and close the power-operated window via the operating

 

voltage (functional test). 

12.

 If available, check and re-adjust protection systems of the safe guard

 

fi xture.

13.

 Check the intactness of the CE label at the power-operated system.

14.

 Check the intactness of warning instructions and labels at the

 

respective drive. 

15.

 Perform a risk assessment in accordance with Machinery Directive

 

2006 / 42 / EG, if required, e.g. after modifying the machine.

08

 m

aintenanCe

 

anD

 r

ePair

Содержание LKS S2 24V DC

Страница 1: ...according to Machinery Directive 2006 42 EC annex VI LKS S2 24V DC Rack and Pinion Drives for windows Assembly and Commissioning Instructions...

Страница 2: ...a Assembly drive with frame bracket K29 Installation step 4b Assembly drive with adjustable clamping B7 and frame bracket K82 Installation step 4c Assembly drive with adjustable clamping B7 and frame...

Страница 3: ...ng Caution Warning Danger due to electric current Caution Warning Risk of crushing and entrapment during device operati on is provided as a sticker with the drive Attention Warning Risk of damage to d...

Страница 4: ...s NSHEV natural smoke and heat exhaust ventilator s in accordance with EN12101 2 without dual purpose for ventilation The need for a risk assessment at the installation site due to the reasonably fore...

Страница 5: ...witch strips or Motor current monitoring systems internal and external Hold to run switch stops movement at HSK 20 mm at a closing force of 150 N at HSK 20 ZAA 5 Operating element in direct range of v...

Страница 6: ...e electrical supply data see product lable and performance limits see technical data as well as the mounting and installation instructions of the drive must be strictly observed and adhered to Do not...

Страница 7: ...able cable lengths and cross sections shall be selected in accordance with the manufacturer s technical data If necessary the cable types shall be coordinated with the competent local authorities and...

Страница 8: ...e instructed in all important opera ting steps If necessary he must be advised of all remaining risks dangers The end user shall be specifically instructed that no additional forces except pushing and...

Страница 9: ...e and heat exhausting systems SHEV as single drive Internal load dependend cut off switch S2 Options Drillings for front suspension Monitored motion run of 2 drives up to s 300 mm via USKM Order data...

Страница 10: ...formation on the most import ant caracteristics such as manufacturer s address article reference number and name technical caracteristics date of manufacturing with firmware version serial number cert...

Страница 11: ...2200 2400 2600 Abstand Antrieb Band ffnungswinkel 2 1 3 4 5 6 7 8 9 10 1 Hubl nge 100 mm 2 Hubl nge 200 mm 3 Hubl nge 300 mm 4 Hubl nge 400 mm 5 Hubl nge 500 mm 6 Hubl nge 600 mm 7 Hubl nge 700 mm 8...

Страница 12: ...balance The test procedure of drives may only be performed on a non slip and secured mat or a test fixture During the test run the test element must not be interfered with The test my only be conducte...

Страница 13: ...2 FAB 1 2 FAB 1 4 FAB 1 4 FAB Tools required Marker Grains Hammer Screwdriver slotted head cross or Torx size by site conditions Hexagonal wrench size 4 5 Fork wrench for SW13 SW14 Torque wrench Power...

Страница 14: ...et K82 for swivelling suspension Frame bracket K5 for swivelling suspension Adjustable clamping B7 Mounting with K5 or K82 Frame bracket K21K For moving the mounting level from the horizontal to the v...

Страница 15: ...g casement outwards opening Frame assembly HSK View on aluminium window View on PVC window Roof window outwards opening Frame assembly HSK Roof window outwards opening Frame assembly HSK View on alumi...

Страница 16: ...associated bolt 6 of the casement brackets F1 into the eyebolt of LKS Optionally adjust the pressure ball of the casement bracket F1 with grub screw and the spring Adjust casement pressure using of th...

Страница 17: ...linder head screws M6 of the adjustable clamping B7 Slide the adjustable clamping B7 gently on the drive body LKS by hand do not force Screw the cylinder head screws M6 of the adjustable clamping B7 a...

Страница 18: ...e bracket K21K M6 Make sure they are parallel to casement edge Casement bracket center and rack must be in line Determine fastenings for casement bracket F10 6 frame bracket K21K and for frame bracket...

Страница 19: ...arefully clear away drilling swarfs to prevent seals from being damaged Avoid surface scratches for example by using masking tape Secure fasteners against loosening e g by applying removable thread lo...

Страница 20: ...propriate cross section for mounting dimensions see drill holes Installation stepe 3 or project specific documents and drawings Note Screws for mounting on the window are to be provided by the custome...

Страница 21: ...s s 300 mm max 2 5 A IP 54 0 C 70 C 110 x 110 x 66 mm Motion monitoring up to 3 drives 2 sequential controls DIP switches for settings Connection terminals 2 5 mm 24V Installation step 6 Electric conn...

Страница 22: ...he homepage of Firm aUM lleR aUMatIc GmbH www aumueller gmbh de Safety CheCk anD teSt Run Formula to calculate the required wire cross section of a supply line Calculation example Available data cut o...

Страница 23: ...ear or damages of cables and fastening elements must be performed During maintenance contaminations must be removed from the drive Fastenings and clamping screws must be checked for tightness Test run...

Страница 24: ...or delivered material is twelve months Warranty and liability claims for personal injuries or material damages are excluded if caused by one or more of the following No proper incoming goods inspectio...

Страница 25: ...25 LKS S2 24V DC Notes 08...

Страница 26: ...26 LKS S2 24V DC Notes 08...

Страница 27: ...s and Conditions of aUM lleR aUtoMatIc GmbH apply to all offers supplies and services The publication of these assembly and commissioning instructions supersedes all previous editions CeRtifiCate anD...

Страница 28: ...9000028501_V0 1_KW05 20...

Отзывы: