Initial Commissioning
30
COMfortel WS-500S/500M - Advanced Information V03 10/2020
•
The subscribers can accept or initiate a call (
roaming
)with their mobile
device in all DECT cells and also switch the DECT cells (
handover
) during
a call.
PBX
•
creates the connection to the public telephone network
•
provides a central administration point for telephone connections and
telephone books
Initial Commissioning
Overview and Processing Sequence
You can do this in one of two different ways:
•
Provisioning via the PBX (
•
Configure them manually using the Web Configurator on the base unit
(
Provisioning via the PBX
Configure them Manually Using the Web Configurator on the Base Unit
1 Take the DECT measurements and carry out site planning
2 Bring the devices to the planned sites
3 Configuring the PBX for provisioning
4 Connect the devices to the local network (LAN)
5 Only COMfortel WS-500M: Set the device role "DECT
Manager and Integrator" on one device.
6 Registering the handsets
1 Take the DECT measurements and carry out site planning
2 Bring the devices to the planned sites
3 Connect the devices to the local network (LAN)
4 Only COMfortel WS-500M: Set the device role "DECT
Manager and Integrator" on one device.
5 Log in to the Web configurator
6 Configuring a base station