Installation
38
12AWFSL
7.12
Checks Less Load
During this procedure, observe all operating components and
check for proper installation and adjustment. DO NOT attempt
to raise vehicle until a thorough
operation check has been
completed.
Be sure the lift
fi
xing to the ground and all anchor bolts tightened.
Carry out two or three complete cycles of lowering and lifting and check:
• The lift is properly anchored and bolts tightened
• The safety locks for proper operation
• Proper oil level in the tank
• No leakage and blow-by in hydraulic line
• Cylinder for proper operation
• The level of the platforms and jacks
• The lift for reaching its maximum height
• The maximum height limit switch operates properly
• The safety limit switch operates properly
• The beeper during
fi
nal travel
7.13
Checking With Load
Carry out two or three complete cycles of lowering and lifting and check:
• Repeat the 7.12 section
• Check no strange noise during lifting and lowering
• If the platforms or jacks weren’t leveled, repeat the 7.8 section
Содержание 12AWFSL
Страница 1: ...Replace This With Cover PDF ...
Страница 16: ...Technical Specification 16 12AWFSL Figure 3A Layout For In Ground Installation ...
Страница 17: ...Technical Specification 17 12AWFSL Figure 3B Layout For On Ground Installation ...
Страница 21: ...Technical Specification 21 12AWFSL Figure 6 Electrical Plan 220V 1Ph ...