Installation
36
12AWFSL
• Verify that both the runways are leveled horizontally by means of a water
gauge or an air bubble and, if necessary, adjust in the following way until
the required conditions obtained:
• unscrew four screws (1/
fi
g.22) on the
bracket on front of scissor arm;
• Adjust two screws (2/
fi
g.22) up or
down until two platforms are leveled
perfectly;
• Once the required conditions have
been obtained, insert the shims on
top of bracket as shown in the
fi
gure
22;
• With the shims and the supplied anchor
bolts in place, tighten by securing the nuts.
7.10
Installation Of Limit Switches (Ref. Fig. 23)
Only skilled personnel must be allowed to carry out this operation.
An improper adjustment of limit switches could cause damages to
the lift, objects and people.
7.10.1 Max. Height Limit Switch
• Place the lift at a height of 85 inches;
• Mount the switch (1) on the bracket;
• Raise it at a height of 85 inches to check
the limit switch for proper installation;
• If the switch was not functioning
properly, it’s possible to adjust it by
screwing the nuts of switch;
• Tighten the nuts after adjustment.
• Fix the switch cover with the supplied
screws.
Содержание 12AWFSL
Страница 1: ...Replace This With Cover PDF ...
Страница 16: ...Technical Specification 16 12AWFSL Figure 3A Layout For In Ground Installation ...
Страница 17: ...Technical Specification 17 12AWFSL Figure 3B Layout For On Ground Installation ...
Страница 21: ...Technical Specification 21 12AWFSL Figure 6 Electrical Plan 220V 1Ph ...