Installation
30
12AWFSL
7.5
Hydraulic System Connection
• Place runways and jack beams at the half way with auxiliary equipment
by using strong ropes, bands or chains. Be sure the runways rests on the
safeties before proceeding;
• Open the front cover of the control unit;
• Following to the Figure 16 route hydraulic lines referring to the letters
shown on them through the pipe in the prepared foundation;
• Connect hydraulic hoses to the
fi
ttings;
• Tighten thoroughly.
When routing the hydraulic hoses, make sure that the hose is
clear of any moving part, make sure to keep the hoses and fi ttings
clean from dust. Failure to do so may result in hydraulic line
failure which may result in damage or personal harm.
Figure 16 – Hydraulic Connections
Содержание 12AWFSL
Страница 1: ...Replace This With Cover PDF ...
Страница 16: ...Technical Specification 16 12AWFSL Figure 3A Layout For In Ground Installation ...
Страница 17: ...Technical Specification 17 12AWFSL Figure 3B Layout For On Ground Installation ...
Страница 21: ...Technical Specification 21 12AWFSL Figure 6 Electrical Plan 220V 1Ph ...