35
Step 2:
Horizontal model
Plinth model
Mark holes B
Mark holes A
Mark holes A
Mark holes B
Lift the hanging bracket, bringing drilling points A in line with the
lower holes in the hanging bracket.
Mark the 2 drilling points B using a pen.
Step 3:
Drill the 4 holes and fit wall plugs suited to your wall (plasterboard,
concrete). Position the hanging bracket and drive in the screws.
1.2.2 - connect the radiator
The appliance must be
supplied with 230V 50 Hz.
The radiator"s power supply must be directly connected to the
network after the omnipolar cut-off device, in conformity with the
installation rules.
A 3-wire cable (Brown = Phase, Blue = Neutral, Black = Pilot wire)
is used to connect to the supply circuit through a junction box. In
humid rooms, such as kitchens and bathrooms, the junction box
must be installed at least 25 cm from the ground. The installation
must be equipped with a 30mA residual-current circuit-breaker
protective device.
Connection to ground is prohibited. Do not connect the pilot
wire (black) to earth.
If the power cable is damaged, it must be replaced by the
manufacturer, their after sales department or by a similarly qualified
person, in order to avoid any danger.