![background image](http://html1.mh-extra.com/html/atag/ic-24/ic-24_installation-and-servicing-instructions-manual_2995192003.webp)
Installation & Servicing instructions ATAG iC-Range
3
Work on the installation should only be carried out by qualifi ed
personnel with calibrated equipment and appropriate tools.
Contents
1
Introduction ....................................................................................................................................4
2
Rules & Regulations (Symbols) .....................................................................................................5
3
Technical specifi cations ..................................................................................................................7
4
Dimensions ...................................................................................................................................9
5
Delivery package ..........................................................................................................................10
6
Boiler description ..........................................................................................................................10
7
Boiler photo components list ........................................................................................................ 11
8
Mounting boiler frame ..................................................................................................................12
8.1
Wall frame ......................................................................................................................... 13
9
Connecting boiler ......................................................................................................................... 14
9.1
Central heating system .....................................................................................................14
9.2
Expansion vessel ..............................................................................................................15
9.3
Water quality .....................................................................................................................15
9.4
Heating systems with plastic pipes ...................................................................................17
9.5
Gas connection in general ................................................................................................17
9.5.1 Natural gas connection (NG) ............................................................................................17
9.5.2 Propane gas connection (LPG) .........................................................................................17
9.5.3 House pressure regulator .................................................................................................18
9.5.4 Dimensioning of the low pressure gas line .......................................................................18
9.5.5 De-aerating the LPG tank ................................................................................................. 18
9.6
Hot water supply ...............................................................................................................19
9.7
Condensation drain pipe ...................................................................................................19
9.8
Flue gas exhaust system ..................................................................................................23
9.8.1 Flue terminal locations ......................................................................................................24
9.8.2 Dimensioning of the fl ue gas and air intake duct ............................................................ 27
9.9
Fitting the boiler onto the boiler frame .............................................................................29
10 Electrical connection ....................................................................................................................31
10.1 One controller, OpenTherm and BUS connection .............................................................32
10.2 Room thermostat volt free connection ..............................................................................32
10.3 ATAG Central Heating volt free timer connection ..............................................................32
10.4 ATAG Hot Water volt free timer connection ......................................................................32
10.5 DHW sensor connection ...................................................................................................32
10.6 ATAG Outside sensor ........................................................................................................32
10.7 230V Control Block (230V live output) ..............................................................................32
10.8 230V Control Block (SwL Switched live) ...........................................................................32
10.9 Electrical diagram .............................................................................................................33
11 Filling system ............................................................................................................................... 34
11.1 Hot water supply ...............................................................................................................34
12 Boiler controls ..............................................................................................................................35
12.1 Controls and explanation of the functions .........................................................................36
13 Commissioning the boiler .............................................................................................................37
13.1 Settings .............................................................................................................................39
13.2 Parameter chapter ............................................................................................................ 39
14 Isolating the boiler .......................................................................................................................40
15 Commissioning ............................................................................................................................. 41
15.1 Checking the CO
2
.............................................................................................................42
15.2 Checking fl ue integrity .......................................................................................................45
15.3 CO and combustion checks ............................................................................................. 46
16 Routine servicing ..........................................................................................................................48
16.1 Flow restrictor ...................................................................................................................52
16.2 Component replacement ...................................................................................................52
16.3 User's instructions .............................................................................................................52
16.4 Warranty ............................................................................................................................52
17 Error codes and fault fi nding .......................................................................................................53
Annex A
System water additives .....................................................................................................54
Annex B
Declaration of conformity ..................................................................................................55
Annex C
Short parts list ...................................................................................................................56
Содержание iC 24
Страница 33: ...Installation Servicing instructions ATAG iC Range 33 Figure 10 7 a 10 9 Electrical diagram...
Страница 56: ...Installation Servicing instructions ATAG iC Range 56 Annex C Short parts list...
Страница 57: ...Installation Servicing instructions ATAG iC Range 57...
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......